Columbia Basin Fish & Wildlife Program
Go to… ▾
Back to SOW
Select a work element:
Work Element must have a deliverable. Last Modified: Virginia Preiss, 06/29/2026 2:32 PM
Sort Template Type Title Start End Status Modified By Modified Date
A EC Required Environmental compliance documentation submitted 10/01/2025 09/30/2026 Active 0 Virginia Preiss 10/01/2025
B User HIP screening completed 10/01/2025 09/30/2026 Active 0 Virginia Preiss 10/01/2025
C User Submit preliminary design alternative (30%) for review 10/01/2025 12/15/2025 Concluded 0 Virginia Preiss 12/15/2025
D User Respond to BPA design review comments (30%) 12/15/2025 09/30/2026 Active 0 Virginia Preiss 01/12/2026
E User Secure landowner access agreement 10/01/2025 09/30/2026 Active 0 Virginia Preiss 10/01/2025
F User Complete cultural resource survey 10/01/2025 09/30/2026 Active 0 Virginia Preiss 10/01/2025
G User Obtain NEPA categorical exclusion 10/01/2025 09/30/2026 Active 0 Virginia Preiss 10/01/2025
H User Submit permit-ready design (60–80%) for review 01/15/2026 09/30/2026 Active 0 Virginia Preiss 01/15/2026
I User Respond to BPA design review comments (60%) 08/01/2026 09/30/2026 Active 0 Virginia Preiss 06/29/2026
J User Submit design with Habitat Design tool 09/01/2026 09/30/2026 Active 0 Virginia Preiss 06/29/2026
K User Upload final engineered design set 09/01/2026 09/30/2026 Active 0 Virginia Preiss 06/29/2026
L Suggested Required Report projected construction start date to BPA COR and EC 08/15/2026 09/30/2026 Active 0 Virginia Preiss 06/29/2026
M DELIV Required Submit final design deliverable. 09/30/2026 Active 0 Virginia Preiss 06/29/2026
Milestone Description
On-the-ground work for this work element cannot begin until environmental compliance documentation is submitted and accepted by BPA.