Contract 84051 REL 50: 2023-001-00 EXP CTCR UPPER COLUMBIA HABITAT IMPROVEMENT PROJECT
| Sort Order | WE ID | Work Element History | Work Element Name | Title | Description | MS | M | L | F | EC | RM | HD | % of Total WSE Effective Budget |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| H | 175 | Existing | Produce Design | Upper Chewuch Floodplain Enhancement | Design phase for reconnecting the Upper Chewuch River to its historic floodplain — draw the designed channel and floodplain extent, then compute pre- and post-project metrics for the SOW. | 13 | 5% | ||||||
| M | 175 | Existing | Produce Design | Salmon Creek Floodplain Design | Salmon Creek has been identified as a priority reach for floodplain reconnection design work. | 13 | 10% | ||||||
| N | 175 | Existing | Produce Design | Omak Creek Instream Complexity | Design phase for adding instream structure and channel complexity along a degraded reach of Omak Creek. | 3 | 10% |