QA

Fish Monitoring Studies

25

Danger Zone

Delete this Commitment List

Once you delete this list, it will delete all of its metadata and relationships to associated commitments. There is no going back. Please be certain.

  • COA 4ESA Consultation and ITP Precedence
  • COA 6Construction Phase Authorization Required Before Construction
  • COA 6.1Pre-implementation Phase Authorization Package
  • COA 6.2Construction Phase Authorization Package Contents
  • COA 7Phase 2 Authorization Required Before Phase 2 Operations
  • COA 7.1Phase 2 Authorization Package Contents
  • COA 7.5Phase 2 Project Operations Report
  • COA 8Consultation and Notification Regarding Amendment
  • COA 9.1Designated Representative
  • COA 9.2Designated Biologists, Fisheries Biologists, and Biological Monitors
  • COA 9.2.1Designated Biologist and Fisheries Biologist Qualifications
  • COA 9.2.2Biological Monitor Qualifications and Duties
  • COA 9.3Biologist and Monitor Stop-Work Authority
  • COA 9.4Worker Education Program
  • COA 9.5Construction Monitoring Documentation
  • COA 9.6Trash Abatement Program
  • COA 9.7Erosion and Sediment Control
  • COA 9.8Delineation of Property Boundaries
  • COA 9.9Delineation of Covered Species Habitat
  • COA 9.10Project Access Routes
  • COA 9.11Staging Areas
  • COA 9.12Vehicle and Equipment Inspection for Invasive Species
  • COA 9.13Refueling and Maintenance Controls
  • COA 9.14Hazardous Waste Spill Response
  • COA 9.15CDFW Access to Project and Mitigation Lands
  • COA 9.16No Disturbance of CDFW Conserved and Managed Lands
  • COA 9.16.1Conservation Easement 50-Foot Buffer
  • COA 9.17Refuse Removal on Completion
  • COA 9.18Wildfire Prevention at Bethany Complex
  • COA 10.1Notification Before Commencement
  • COA 10.2Notification of Non-compliance
  • COA 10.3Tracking Habitat Feature Disturbances and GIS Reporting
  • COA 10.4Suitable Habitat Monitoring Features by Species
  • COA 10.5Reporting Approved Habitat Maps
  • COA 10.6Photo Monitoring Stations
  • COA 10.7Species Observations Outside of Mapped Habitat
  • COA 10.8Habitat Evaluation Field Survey for Covered Species
  • COA 10.9Tracking Temporary and Permanent Impacts
  • COA 10.10Daily Compliance Monitoring and Inspection Records
  • COA 10.11Environmental Compliance Monitoring Plan
  • COA 10.12Monthly Compliance Report
  • COA 10.13Annual Status Report
  • COA 10.14CNDDB Observation Submittals
  • COA 10.15Final Mitigation Report
  • COA 10.15.1Mitigation Status Report Before ITP Expiration
  • COA 10.16Notification of Take or Injury/Damage
  • COA 10.17Subsurface Vibratory Testing and Monitoring Study
  • COA 10.22Personnel Conducting Studies and Monitoring
  • COA 10.23Sacramento River Bathymetric Surveys
  • COA 10.24Mathematical Model Development Deliverables
  • COA 10.24.1Sacramento River Hydraulic Model
  • COA 10.24.2Sediment Transport Model
  • COA 10.25North Delta Intake Hydraulic Modeling Deliverables
  • COA 10.25.1Intake Structure Hydraulic Model, Mathematical
  • COA 10.25.2Intake Structure Hydraulic Modeling, Physical
  • COA 10.25.3Intake Tee Screen Hydraulic Model, Mathematical
  • COA 10.25.4Intake Tee Screen Hydraulic Model, Physical
  • COA 10.26Fish Guidance System Working Group and Study Plan
  • COA 10.27Hydraulic Testing for Velocity Requirements
  • COA 10.27.1Hydraulic Testing Procedures and Plan Contents
  • COA 10.27.2Approach Velocity Testing Compliance
  • COA 10.27.3Hydraulic Testing Reports
  • COA 10.28Fish Screen Visual Inspections
  • COA 10.29Sediment Management Inspections at Intakes
  • COA 10.30Screen Impingement Study
  • COA 11.1Covered Species Observations and Work Stoppage
  • COA 11.2Covered Species Injury Response
  • COA 11.3Covered Species Capture, Handling, and Reporting
  • COA 11.4Pesticide, Fungicide, and Herbicide Use Restrictions
  • COA 11.5Prohibition of Rodenticide and Poison Use
  • COA 11.6Fertilizer Use Restrictions
  • COA 11.7Daily Work Restrictions
  • COA 11.8Artificial Lighting at Night
  • COA 11.9Lighting on Intake Structure
  • COA 11.10Visual Barriers Along Access Routes for Nighttime Activities
  • COA 11.11Project Vehicle Speed Limits
  • COA 11.12Wildlife Road-crossing Structures
  • COA 11.13Precipitation Work Limit
  • COA 11.14Daily Entrapment Inspections
  • COA 11.15Pipes, Culverts, and Other Materials Inspections
  • COA 11.16Disposal of Spoils, RTM, and Dredged Material
  • COA 11.17Electrical Power Line Support Placement
  • COA 11.17.1Transmission Line Bird Strike Diverters
  • COA 11.18Vegetation Management
  • COA 11.19Prevention of Spread of Invasive Species
  • COA 11.19.1Invasive Plant Species Monitoring, Management, and Control Plan
  • COA 11.19.2Invasive Plant Species Management
  • COA 11.20Hazards to Covered Species
  • COA 11.21Hazardous Materials Management Plans
  • COA 11.22Spill Prevention, Control, and Countermeasure Plans
  • COA 11.23Groundwater Testing and Monitoring Plan
  • COA 11.24Detection of Underground and Natural Gas Wells
  • COA 11.25Stormwater Pollution Prevention Plans
  • COA 11.26Erosion and Sediment Control Plans
  • COA 11.27Erosion Control Stabilization Prohibitions
  • COA 11.28Monofilament Netting Prohibition
  • COA 11.29Fugitive Dust Control
  • COA 11.30Construction Mercury Management and Monitoring Plan
  • COA 11.31.1Preconstruction Geotechnical Exploration Work Windows
  • COA 11.31.2Construction In-Water Work Windows and Pile Driving Limits
  • COA 11.32Daily In-Water Work Restriction
  • COA 11.33Underwater Sound Abatement Plan
  • COA 11.34Pile Driving Plan
  • COA 11.35Fish Salvage Plan
  • COA 11.36Barge Operations Plan
  • COA 11.37Dewatering Plan
  • COA 11.38Preconstruction Survey Protocols for Covered Species
  • COA 11.39CTS Habitat Avoidance and Encounter Response
  • COA 11.39.1Vehicle Speed Limits in CTS Habitat
  • COA 11.40CTS Breeding Habitat Avoidance Near Conserved Lands
  • COA 11.41CTS Measures for Preconstruction, SCADA, Transmission and Access Road Work
  • COA 11.42CTS Preconstruction and Construction-Phase Surveys
  • COA 11.42.1CTS Preconstruction Watering Protocol
  • COA 11.42.2CTS Mowing Restrictions
  • COA 11.43CTS Exclusion Barrier Installation and Maintenance
  • COA 11.44CTS Seasonal Work Window
  • COA 11.45Rain Forecast Work Stoppage Near CTS Breeding Sites
  • COA 11.46CTS Time of Day Work Restriction
  • COA 11.47Night Work Lighting Near CTS Habitat
  • COA 11.48Initial Site Clearing and CTS Monitoring
  • COA 11.49CTS Burrow Avoidance or Treatment
  • COA 11.49.1Flagging CTS Burrows and No-Activity Buffers
  • COA 11.49.2CTS Burrow Excavation by Designated Biologist
  • COA 11.50CTS Capture and Handling Protocols
  • COA 11.51CTS Mortality Reduction and Relocation Plan
  • COA 11.51.1CTS Relocation From Construction Site Buffer
  • COA 11.51.2Capture, Handling and Release of CTS Into Burrows
  • COA 11.51.3CDFW Notification of CTS Relocation
  • COA 11.52Notification of CTS Take or Injury
  • COA 11.52.1Release of CTS With Minor Injury
  • COA 11.52.2Treatment of Seriously Injured CTS
  • COA 11.52.3Handling of Recently Deceased CTS
  • COA 11.52.4Written Incident Report for CTS Take or Injury
  • COA 11.53Invasive Species Prohibition Near CTS Habitat
  • COA 11.54Environmentally Sensitive Areas for GGS Habitat
  • COA 11.55GGS Habitat Avoidance and Encounter Response
  • COA 11.55.1Vehicle Access and Speed in GGS Habitat
  • COA 11.56GGS Preconstruction and Clearance Surveys
  • COA 11.57Mowing Restrictions in GGS Habitat
  • COA 11.58GGS Seasonal Work Window
  • COA 11.58.1Low Rainfall and Dry Weather Work Period in GGS Habitat
  • COA 11.59GGS Seasonal Work Restriction Exception
  • COA 11.60In-Channel Work and GGS Seasonal Restriction
  • COA 11.61Dewatering of GGS Aquatic Habitat
  • COA 11.62GGS Exclusion Barrier Installation and Maintenance
  • COA 11.62.1GGS Refugia Flagging and No-Activity Buffers
  • COA 11.62.2GGS Burrow Excavation by Designated Biologist
  • COA 11.63Initial Site Clearing and GGS Monitoring
  • COA 11.64Disposal of Natural Debris in GGS Habitat
  • COA 11.65GGS Measures for Preconstruction, SCADA, Transmission and Access Road Work
  • COA 11.66Restoration of Temporary Impacts to GGS Habitat
  • COA 11.67GGS Mortality Reduction and Relocation Plan
  • COA 11.67.1GGS Handling, Relocation and Notification
  • COA 11.68Notification of GGS Take or Injury
  • COA 11.68.1Release of GGS With Minor Injury
  • COA 11.68.2Treatment of Seriously Injured GGS
  • COA 11.68.3Handling of Recently Deceased GGS
  • COA 11.68.4Written Incident Report for GGS Take or Injury
  • COA 11.69SWHA Habitat Avoidance and Access Restrictions
  • COA 11.70SWHA Nesting Season Work Restriction
  • COA 11.71SWHA Nest Tree Surveys and Survey Schedule
  • COA 11.72SWHA Occupied Nest No-Disturbance Buffer
  • COA 11.73SWHA Nest Monitoring During Covered Activities
  • COA 11.74Disturbance of Occupied SWHA Nest Tree
  • COA 11.75Designated Biologist Authority for Distressed Nesting SWHA
  • COA 11.76SWHA Nest Tree Avoidance and Removal Approval
  • COA 11.77Woody Vegetation Removal Outside SWHA Nesting Season
  • COA 11.78SWHA Nesting Habitat Delineation for Preconstruction Activities
  • COA 11.79SWHA Measures for SCADA and Transmission Line Work
  • COA 11.80SWHA Mortality Reduction and Relocation Plan
  • COA 11.81Notification of SWHA Take or Injury
  • COA 11.82TRBL Avoidance and Daily Activity Window
  • COA 11.83TRBL Preconstruction Habitat Assessment
  • COA 11.84TRBL Nesting and Roosting Habitat Surveys
  • COA 11.84.1TRBL Nesting Habitat Preconstruction Surveys
  • COA 11.84.2TRBL Roosting Habitat Preconstruction Surveys
  • COA 11.85TRBL Nest Buffer Zone
  • COA 11.86TRBL Nest Buffer Monitoring
  • COA 11.87TRBL Roosting Site Buffer Zone
  • COA 11.88TRBL Roosting Site Buffer Monitoring
  • COA 11.89Disturbance of TRBL Breeding Colonies and Roost Sites
  • COA 11.90Delineation of TRBL Nesting and Roosting Habitat
  • COA 11.91Helicopter Restrictions Near TRBL Colonies and Roosts
  • COA 11.92TRBL Mortality Reduction and Relocation Plan
  • COA 11.93Notification of TRBL Take or Injury
  • COA 11.94CBB Habitat Avoidance and Nest Encounter Response
  • COA 11.95CBB Seasonal Restriction on Vegetation and Ground Disturbance
  • COA 11.96CBB Preconstruction Habitat Assessment
  • COA 11.97CBB Surveys During Construction and Maintenance
  • COA 11.98CBB Nest No-Activity Buffer Zone
  • COA 11.99CBB Daily Monitoring
  • COA 11.100Avoidance or Treatment of CBB Underground Refugia
  • COA 11.101Vegetation Management in CBB Habitat
  • COA 11.102CBB Nest Relocation Plan
  • COA 11.103Notification of CBB Take or Injury
  • COA 11.104MALI Initial Site Clearing and Monitoring
  • COA 11.105MALI Preconstruction Surveys
  • COA 11.106MALI No-Activity Buffer Zone
  • COA 11.107MALI Measures for SCADA and Transmission Line Maintenance
  • COA 11.108MALI Translocation Plan
  • COA 11.109Velocity Requirements at North Delta Intakes
  • COA 11.109.1No Diversions Without North Delta Intake Screens
  • COA 11.110Phase 1 and Phase 2 Authorized Operations
  • COA 11.111Diversion Criteria for North Delta Intakes
  • COA 11.111.1June Operations Diversion Criteria
  • COA 11.111.2Seasonal Operations of the North Delta Intakes
  • COA 11.111.3North Delta Diversion Monitoring Team and Risk Assessments
  • COA 11.111.4Chartering the North Delta Diversion Monitoring Team
  • COA 11.111.5Collaborative Approach to Real-time Decision Making
  • COA 11.111.6Salmon Presence Off-ramp
  • COA 11.112Reservoir Storage
  • COA 11.113Shifting Exports During Balanced Conditions
  • COA 11.114Additional Diversions from North Delta Intakes Daily Cap
  • COA 11.115Delta Smelt and Longfin Smelt Biological Criteria Model Approval
  • COA 11.115.1Smelt Biological Criterion 1
  • COA 11.115.2Smelt Biological Criterion 2
  • COA 11.116Winter- and Spring-run Chinook Salmon Biological Criteria Model Approval
  • COA 11.116.1Salmonid Biological Criterion 1
  • COA 11.116.2Salmonid Biological Criterion 2
  • COA 11.117White Sturgeon Biological Criteria Model Approval
  • COA 11.117.1White Sturgeon Biological Criterion 1
  • COA 11.117.2White Sturgeon Biological Criterion 2
  • COA 12Habitat Management Land Acquisition and Restoration
  • COA 12.1Project Footprint Features with Impact Multiplier Percentages
  • COA 12.2Restoration from Temporary Preconstruction Impacts
  • COA 12.3Temporary Impacts and On-Site Restoration
  • COA 12.3.1Temporary Impact Criteria
  • COA 12.3.2Temporary Impact Restoration Schedule
  • COA 12.3.3Restoration and Revegetation Plan
  • COA 12.3.4Restoration Monitoring and Maintenance
  • COA 12.4Bird Strike Diverters on Transmission Lines
  • COA 12.5.1SWHA Compensation for Lost Occupied Nest Sites
  • COA 12.5.2SWHA Compensation for Lost Suitable Nest Trees
  • COA 12.5.3SWHA Replacement Nest Tree Monitoring and Success Criteria
  • COA 12.6.1Construction Mitigation for Delta Smelt and Longfin Smelt
  • COA 12.6.2Operations Mitigation for Delta Smelt
  • COA 12.6.3Delta Smelt Summer–Fall Habitat Action
  • COA 12.6.4Operations Mitigation for Longfin Smelt
  • COA 12.6.5Spring Longfin Smelt Distribution
  • COA 12.6.6Longfin Smelt Refugial Population Establishment and Management
  • COA 12.7.1Construction Mitigation for CHNWR and CHNSR
  • COA 12.7.2Operations Mitigation for CHNWR and CHNSR
  • COA 12.8.1Construction Mitigation for White Sturgeon
  • COA 12.8.2Operations Mitigation for White Sturgeon
  • COA 12.9Cost Estimates for Security
  • COA 12.9.1Land Acquisition Cost Estimates
  • COA 12.9.3Management Funding Estimates
  • COA 12.10Covered Species Credits
  • COA 12.11.1HM Lands Fee Title
  • COA 12.11.2HM Lands Conservation Easement
  • COA 12.11.3HM Lands Approval
  • COA 12.11.4HM Lands Documentation
  • COA 12.11.5HM Lands Land Manager
  • COA 12.11.6HM Lands Start-up Activities
  • COA 12.11.7HM Lands Interim Management
  • COA 12.12In-Perpetuity Management Funding
  • COA 12.12.1Identify an Endowment Manager
  • COA 12.12.2Calculate the Endowment Funds Deposit
  • COA 12.12.2.1Endowment Capitalization Rate and Fees
  • COA 12.12.2.2Endowment Buffers and Assumptions
  • COA 12.12.2.2.1Endowment 10 Percent Contingency
  • COA 12.12.2.2.2Endowment Three Years Delayed Spending
  • COA 12.12.2.2.3Endowment Non-annualized Expenses
  • COA 12.12.3Transfer Long-term Endowment Funds
  • COA 12.12.4Management of the Endowment
  • COA 12.13Reimburse CDFW
  • COA 13.1Security Amount
  • COA 13.2Security Form and CESA Mitigation Funding Strategy
  • COA 13.3Demonstration of Performance
Selected: 0
COA
Requirement text
Type
Scope
Frequency
Responsible party
Phases
Timing
Deliverable
Species
Construction activities
Open requirement
Help & Guidance

Beacon

On this page

Terms

Page