QA

Desktop Actions

182

Danger Zone

Delete this Action List

Once you delete this list, it will delete all of its metadata and relationships to associated actions. There is no going back. Please be certain.

Avoidance & BMPs26
  • Adjust and Retest Fish Screen Baffles After a Non-Compliant Test
  • Block burrows after confirming vacancy
  • Clean and decontaminate equipment at each work site
  • Complete fish salvage and relocation before in-water work
  • Conduct daily clearance surveys before work begins
  • Conduct hydroacoustic monitoring during in-water pile driving
  • Cover open excavations at the close of each working day
  • Delineate and sign occupied nest and roost buffers
  • Delineate Covered Species Habitat and Fence Construction Sites
  • Delineate habitat, buffers, and construction site boundaries
  • Dewater aquatic habitat and hold the dry period
  • Excavate and collapse burrows ahead of trenching
  • Flag and Sign Cross-Country Access Routes
  • Install Bird Strike Diverters on New Transmission Lines
  • Install Erosion and Sediment Control Measures Before Earth-Moving
  • Install erosion and sediment controls ahead of storms
  • Install ESA fencing and identification signage
  • Install exclusion barriers at work areas and shaft openings
  • Install visual barriers along night access routes
  • Install wildlife under-crossing culverts and speed limit signage
  • Obtain agency approval of designated wildlife handlers
  • Plant Vegetative Ground Cover on Disturbed Areas
  • Prepare the hazardous materials management plan
  • Remove and Clean North Delta Intake Fish Screens
  • Remove exclusion barriers after covered activities end
  • Remove Temporary Fill and Construction Refuse at Completion
Monitoring18
  • Conduct and Report Preconstruction SWHA Nest Monitoring
  • Conduct Annual Invasive Plant Survey
  • Conduct Annual TRBL Survey During Construction
  • Conduct Baseline and Annual In-Water Mercury Monitoring
  • Conduct Ecological Response Evaluation Studies
  • Conduct Fisheries Evaluation Studies for Covered Fish
  • Conduct North Delta Intake Fish Screen Hydraulic Tests
  • Conduct Photo Monitoring of Temporary Impact Areas
  • Conduct Water Quality Evaluation Studies
  • Implement CDFW-Approved Subsurface Vibration Study
  • Implement Covered Fish Species Monitoring and Science Program
  • Implement Fish Screen Impingement Study
  • Inspect Sediment Deposition at Intake Tee Screens Annually
  • Install Real-Time Water Quality Monitoring Station
  • Notify Designated Representative of SWHA Nest Distress
  • Retest Fish Screen Hydraulics After a Qualifying Event
  • Survey Riverbank and Vegetation Conditions at Barge Sites
  • Verify Impact Multipliers in the Annual Status Report
Restoration & Mitigation10
  • Backfill and Restore Preconstruction Investigation Sites
  • Complete HM Lands Start-Up Fencing, Signage and Enhancement
  • Complete Mitigation and HM Lands Protection Before Impacts
  • Develop and Implement Methylmercury Management Approach
  • Fund and Complete White Sturgeon Mitigation Projects
  • Plant Replacement Swainson's Hawk Nest Trees
  • Restore Riverbank Eroded by Barge Operations
  • Restore Temporarily Impacted Habitat to Pre-Project Conditions
  • Site, Design and Restore Construction Mitigation Habitat for Covered Fish
  • Site, Design and Restore Operations Mitigation Habitat for Covered Fish
Survey27
  • Complete Baseline Biological Assessment and Land Survey
  • Complete Pre-Disturbance Habitat Photo Documentation
  • Conduct and Report Annual CTS Surveys
  • Conduct and Report Annual GGS Surveys
  • Conduct and Report Annual SWHA Nest Tree Surveys
  • Conduct Annual CBB Flight Season Surveys
  • Conduct Annual MALI Surveys in Suitable Habitat
  • Conduct Baseline Food Web Resource Surveys
  • Conduct Baseline Invasive Plant Survey
  • Conduct Baseline TRBL Habitat Assessment
  • Conduct CTS Walking Clearance Survey Before Ground Disturbance
  • Conduct GGS Survey Before Exclusion Fencing Installation
  • Conduct Habitat Evaluation Field Survey
  • Conduct Nesting-Season SWHA Survey Before Field Investigations
  • Conduct Post-Dewatering GGS Clearance Survey
  • Conduct Pre-Activity CBB Foraging and Nest Surveys
  • Conduct Preconstruction CBB Habitat Survey
  • Conduct Preconstruction GGS Survey
  • Conduct Preconstruction MALI Survey
  • Conduct Preconstruction SWHA Nest Tree Survey
  • Conduct Preconstruction TRBL Breeding-Colony Surveys
  • Conduct Preconstruction TRBL Habitat Survey
  • Conduct Preconstruction TRBL Roosting-Habitat Surveys
  • Conduct Sacramento River Bathymetric Surveys Near the Intakes
  • Establish Restoration Treatment and Reference Transects
  • Flag Burrows and Habitat Features Before Earthmoving
  • Fund and Implement the DS/LFS Spawning Habitat Study
Training & Education4
  • Conduct Spill Response and Containment Training
  • Conduct Worker Education Program and Annual Refresher Training
  • Train and Staff Fish Salvage Teams Before Site Access
  • Train Tugboat and Barge Operators on Habitat Impacts
Selected: 0
Action text
Frequency
Deliverable
Species
Timing
Expected evidence
Requirements (0)
    Open action
    COA
    Requirement text
    Type
    Scope
    Frequency
    Responsible party
    Phases
    Timing
    Deliverable
    Species
    Construction activities
    Open requirement