Contractor Field Index

265

Danger Zone

Delete this Compliance Index List

Once you delete this list, it will delete all of its metadata and relationships to associated items. There is no going back. Please be certain.

Agency reporting and approvals43
Agency approvals22
  • Calculate Phase Security Amount Before Phase Approval
  • Consult CDFW on Federal Biological Opinions
  • Coordinate with CDFW on Breeding Habitat Buffer Encroachment
  • Notify and Consult CDFW on ITP Amendment Conditions
  • Obtain CDFW Approval for In-Channel Work in the GGS Active Season
  • Obtain CDFW Approval of Dewatering Measure Deviations
  • Obtain CDFW Approval of HM Lands Before Acquisition
  • Obtain CDFW Approval of Nighttime Covered Activities
  • Obtain CDFW Approval of the Mitigation or Conservation Bank
  • Obtain CDFW Approval to Extend Phase 1 Operations
  • Obtain CDFW Approval to Work Outside the Seasonal Window
  • Obtain CESA Authorization for HM Lands Activities
  • Submit Aquatic Conditions Assessments with the Phase 2 Package
  • Submit Construction Phase Authorization Package to CDFW
  • Submit Fish Study Plans and Reports for CDFW Approval
  • Submit Joint Operations Study Results and Compliance Report
  • Submit Phase 2 Authorization Package to CDFW
  • Submit Pre-implementation Phase Authorization Package to CDFW
  • Submit Preconstruction Habitat Survey Results in the Phase Package
  • Submit Species and Habitat Survey Protocols to CDFW
  • Submit Subsurface Vibration Study Results to CDFW
  • Submit Supplemental Phase 1 Operations Data Before Phase 2
Non-compliance reporting2
  • Notify CDFW of Inability to Comply with the ITP
  • Report ITP Non-Compliance to CDFW
Periodic compliance reports3
  • Deliver Final Phase Mitigation Report to CDFW
  • Deliver Mitigation Status Report Before ITP Expiration
  • Submit Photo Monitoring Documentation Report
Schedule notices3
  • Conduct Preconstruction GGS Survey
  • Notify CDFW 14 Days Before Starting Covered Activities
  • Notify CDFW 60 Days Before In-Water Maintenance
Species sightings and CNDDB reporting3
  • Report Covered Species Sightings to CDFW
  • Submit Covered Species Observations to CNDDB
  • Biological Monitor daily communication and immediate reports to the Designated Biologist
Take and injury reporting10
  • Consult CDFW on Deceased CTS Specimen Disposal
  • Notify CDFW of Potential CBB Nest Loss
  • Notify CDFW of TRBL Nest or Colony Abandonment or Distress
  • Notify the Designated Biologist of CBB, CTS or SWHA Take or Injury
  • Notify the Designated Biologist of Covered Species Take or Injury
  • Report CBB, CTS and SWHA Take or Injury Incidents to CDFW
  • Report Covered Species Take or Injury to CDFW
  • Report GGS Relocations to CDFW
  • Submit Phase 2 Project Operations Report to CDFW
  • Carcass salvage, labeling and storage for the wildlife health lab
Amphibians and reptiles31
Amphibians31
  • Conduct and Report Annual CTS Surveys
  • Conduct CTS Walking Clearance Survey Before Ground Disturbance
  • Conduct daily clearance surveys before work begins
  • Consult CDFW on Non-Native or Hybrid Salamander Measures
  • Report Barred Tiger Salamander or Hybrid Detections to CDFW
  • Submit CTS Relocation Plan
  • Submit Preconstruction CTS Burrow Watering Protocol
  • Biological monitoring of initial grading and excavation
  • Biologist presence during site selection, access and set-up
  • Biologist survey before work resumes after rain
  • Breeding habitat no-activity buffer
  • Burrow avoidance
  • Burrow Avoidance
  • Burrow monitoring when night lighting spills toward habitat
  • Burrow release protocol
  • Clearance survey after barrier repair
  • Daily burrow check before work starts
  • Habitat disturbance work window
  • Habitat Disturbance Work Window
  • Hand excavation of burrows in the trench alignment
  • Morning survey after burrow watering
  • Mowing pattern
  • Mowing Pattern
  • Night Work Prohibition After Construction
  • No-Activity Buffer Around Occupied Burrows
  • No-activity buffer around occupied burrows and refugia
  • Occupied burrow no-activity buffer
  • Presence surveys before and during each work day
  • Presence surveys before and during each work day
  • Site survey before work on days with rain forecast
  • Yearly site assessment of the active season
Birds1
Bird strike diverters1
  • Submit Bird Strike Diverter Location and Type Plan
Fish17
Aquatic habitat mitigation3
  • Coordinate with CDFW on Mitigation Site Selection and Design
  • Site, Design and Restore Construction Mitigation Habitat for Covered Fish
  • Site, Design and Restore Operations Mitigation Habitat for Covered Fish
Chinook salmon1
  • Coordinate Annual Selection of CHNWR and CHNSR Funded Projects
Delta smelt and longfin smelt2
  • Contribute Funding to the Longfin Smelt Culture Program
  • Develop CDFW-Approved Spring LFS Operational Scenario
Fish rescue and salvage9
  • Complete fish salvage and relocation before in-water work
  • Notify CDFW Before Dewatering or Fish-Isolating Work
  • Notify CDFW When Fish Salvage Is Complete
  • Submit Fish Salvage Plan
  • Train and Staff Fish Salvage Teams Before Site Access
  • Dead Specimen Preservation
  • Fisheries biologist present to rescue fish during dewatering
  • Preservation and delivery of dead covered fish
  • Preservation and delivery of dead covered specimens
White sturgeon2
  • Complete WS Life Cycle Model Re-Evaluation Report
  • Fund and Complete White Sturgeon Mitigation Projects
Habitat protection20
Exclusion fencing and ESAs1
  • Submit Exclusion Barrier Design and Locations to CDFW
Habitat avoidance and work footprint9
  • Conduct Habitat Evaluation Field Survey
  • Avoidance Measures in Unmapped Habitat
  • Conservation Easement Buffer
  • Geotechnical investigation avoidance of aquatic features
  • No Disturbance of CDFW Conserved Lands
  • Suitable habitat avoidance
  • Suitable Habitat Avoidance
  • Work footprint limit
  • Work Footprint Limit
Habitat impact tracking10
  • Calculate Phase Impacts and Mitigation for Authorization Package
  • Complete Pre-Disturbance Habitat Photo Documentation
  • Conduct Photo Monitoring of Temporary Impact Areas
  • Establish Restoration Treatment and Reference Transects
  • Notify CDFW of Likely Impact Exceedance and Revised Schedule
  • Report Habitat Disturbance Acreage and GIS Layers to CDFW
  • Survey Riverbank and Vegetation Conditions at Barge Sites
  • Verify Impact Multipliers in the Annual Status Report
  • GIS tracking of land disturbance and suitable habitat feature impacts
  • GIS tracking of land disturbance and suitable habitat feature impacts
Hazards8
Pesticides and rodenticides8
  • Obtain CDFW Approval for Pesticide and Herbicide Use
  • Submit Fertilizer Application Plan
  • Submit Fertilizer Application Plan for CDFW Approval
  • Submit Herbicide and Pesticide Application Plan
  • Licensed Pesticide Applicator
  • Pesticide Application Wind Limit
  • Pesticide Setback from Aquatic Habitat
  • Rodenticide and Poison Prohibition
Mitigation and restoration52
Conservation endowment4
  • Obtain CDFW Approval of the Endowment Management Agreement
  • Prepare Endowment Assessment for CDFW Approval
  • Submit Endowment Assessment for CDFW Approval
  • Submit Endowment Manager Proposal to CDFW
Mitigation funding2
  • Funding of interim management of Habitat Management lands
  • Holding, pooling and disbursement of the Endowment
Mitigation funding contributions1
  • Fund CHNWR, CHNSR and White Sturgeon Operations Mitigation
Mitigation lands26
  • Complete Baseline Biological Assessment and Land Survey
  • Complete HM Lands Start-Up Fencing, Signage and Enhancement
  • Complete Mitigation and HM Lands Protection Before Impacts
  • Demonstrate Project Funding Arrangements to CDFW
  • Designate CDFW-Approved Interim and Long-Term Land Managers
  • Establish Long-Term HM Lands Management Endowment
  • Fund Annual Endowment Deposit Amount Installment
  • Notify CDFW and Provide a Plan for a Stay-Ahead Shortfall
  • Notify CDFW of a Land Manager Change
  • Obtain CDFW Approval of Mitigation Habitat Restoration Projects
  • Obtain CDFW Approval of the HM Lands Conservation Easement
  • Prepare HM Lands Management Plan
  • Prepare Phase Security Cost Estimate for HM Lands
  • Provide Annual Long-Term HM Lands Management Funding
  • Provide Title and Environmental Documentation for HM Lands
  • Reimburse CDFW Costs for ITP Issuance and Monitoring
  • Submit and Update the CESA Mitigation Funding Strategy
  • Submit Credit Bill of Sale and Payment Receipt to CDFW
  • Compensatory habitat acreage for each covered species
  • Fee title to Habitat Management lands
  • Habitat Management lands stay-ahead ratio
  • Integration of the spawning habitat study into shallow spawning habitat design
  • Interim management of Habitat Management lands
  • Long-term monitoring of tidal habitat mitigation sites
  • Ongoing demonstration of mitigation performance during the permit term
  • Perpetual management, maintenance and monitoring of Habitat Management lands
Restoration18
  • Backfill and Restore Preconstruction Investigation Sites
  • Develop Temporary Impact Restoration Schedule
  • Develop Tidal Wetland Restoration Efficacy Study Plan
  • Remove Temporary Fill and Construction Refuse at Completion
  • Restore Riverbank Eroded by Barge Operations
  • Restore Temporarily Impacted Habitat to Pre-Project Conditions
  • Submit Restoration and Revegetation Plan
  • Submit Restoration Monitoring Reports to CDFW
  • Erosion protection of restoration soils until vegetation establishes
  • Invasive plant management and cover limit at restoration sites
  • Monitoring and maintenance of habitat restoration areas
  • Monitoring of restored habitat until success
  • Restoration survivorship and cover success standards with remedial action
  • Seed mix composition and sourcing for restoration
  • Seeding timing and reseeding at restoration sites
  • Substrate removal, topsoil salvage and imported fill in restoration areas
  • Target native vegetation community for each restoration area
  • Vehicle Barriers on Restored Shoulders
Security and funding assurances1
  • Submit Covered Fish Monitoring Funding Strategy to CDFW
Noise and vibration2
Vibration2
  • Implement CDFW-Approved Subsurface Vibration Study
  • Submit Subsurface Testing and Monitoring Study Plan
People and qualifications4
Designated biologists and monitors2
  • Submit Annual Biologist Reapproval List to CDFW
  • Submit Biologist Resume Forms to CDFW Before Each Phase
Qualified specialists2
  • Notify CDFW of the Designated Representative and Substitutes
  • Permitted personnel for studies that may take Covered Fish Species
Plants and invertebrates28
Bumble bees and monarchs19
  • Conduct Annual CBB Flight Season Surveys
  • Conduct Pre-Activity CBB Foraging and Nest Surveys
  • Conduct Preconstruction CBB Habitat Survey
  • Notify CDFW of a CBB Detection
  • Obtain agency approval of designated wildlife handlers
  • Report CBB Sightings to the Designated Biologist
  • Submit CBB Buffer Zone Design Plan
  • Submit CBB Nest Relocation Plan
  • Active nest buffer
  • Daily visual sweeps for bee flight activity during work
  • Flowering Vegetation Removal Timing
  • Inspection and supervision of refugia removal during overwintering
  • Monitoring of a relocated nest
  • Overwintering Habitat Disturbance Avoidance
  • Relocation as a last resort under the approved protocol
  • Search for the active nest when a bee is detected on site
  • Stop work on covered species discovery
  • Underground refugia buffer
  • Vegetation removal clearance near refugia
Special-status plants9
  • Conduct Annual MALI Surveys in Suitable Habitat
  • Conduct Preconstruction MALI Survey
  • Report CTS and MALI Relocations to CDFW
  • Submit MALI Translocation Plan
  • Avoidance of covered plant removal
  • Covered Plant Removal Avoidance
  • Levee Landside Line Maintenance
  • Post-disturbance grading to elevations and hydrology suitable for covered plants
  • Special-status plant occurrence buffer
Site conduct16
Agency and biologist access6
  • Agency access to construction sites
  • CDFW access to the Project and mitigation lands
  • Construction-monitoring documentation kept on site
  • No agreements restricting contractor or biologist communication with CDFW
  • Unfettered biologist access to the Project Site
  • Wallet card or fact sheet carried by workers in the Project Area
Compliance inspections and records4
  • Develop Environmental Compliance Monitoring Plan per Site
  • Submit Monthly Compliance Report to CDFW
  • Daily biologist compliance inspection at each construction site and maintenance activity
  • Daily written observation and inspection record
Facility design and siting6
  • Install Bird Strike Diverters on New Transmission Lines
  • Submit Culvert Under-Crossing Count and Location Report
  • Annual inspection and replacement of bird strike diverters
  • Bird Strike Diverter Maintenance
  • Power line and support structure siting away from covered species habitat
  • Roadway design passable by covered species
Water27
Barge and vessel operations9
  • Report Vessel Groundings and Barge Plan Deviations to CDFW
  • Submit Barge Operations Plan
  • Barge Mooring and Anchoring
  • Biological monitoring of barge operations
  • Propeller Wash Limit
  • Vessel Deck Loose Material Containment
  • Vessel Navigation Regulation Compliance
  • Vessel Speed and Wake Limit
  • Vessel Spill Kits Onboard
Geotechnical exploration1
  • Submit Over-Water Geotechnical Exploration Description to CDFW
Groundwater3
  • Disclose Detected Wells in the Construction Phase Package
  • Submit Groundwater Testing and Monitoring Plan
  • Submit Underground Well Detection Plan
Invasive species10
  • Clean and decontaminate equipment at each work site
  • Conduct Annual Invasive Plant Survey
  • Report Invasive Aquatic Species Detections to CDFW
  • Submit Invasive Plant Species Monitoring, Management and Control Plan
  • Invasive Animal Removal
  • Invasive plant removal methods in restoration areas
  • Invasive species inspection of in-water equipment before deployment
  • Invasive Species Spread Prevention
  • Pathogen Spread Prevention BMPs
  • Predatory Species Introduction Prohibition
Water quality4
  • Conduct Baseline and Annual In-Water Mercury Monitoring
  • Develop and Implement Methylmercury Management Approach
  • Report Mercury Monitoring Results to CDFW
  • Submit Mercury Management and Monitoring Plan
Water operations79
Biological performance criteria7
  • Develop Real-Time Biological Criteria Compliance Model
  • Obtain CDFW Approval of Biological Criteria Compliance Models
  • Biological criterion on entrainment, survival and abundance reduction
  • Biological criterion on population growth rate
  • Covered Fish Species Biological Criteria met during operations
  • Funding and data support for Covered Fish Species life cycle models
  • No entrainment of juvenile salmon at the north Delta intakes
Diversion limits and bypass flows20
  • Complete Joint Operations Optimization Study
  • Develop Hydraulic Data Plan for Operating Criteria
  • Prepare Weekly Operating-Criteria Risk Assessment Report
  • Submit Joint Operations Optimization Study Plan
  • Additional Suisun Marsh Salinity Control Gate operating days for Delta smelt habitat
  • Annual Operating Criteria Schedule
  • Annual schedule for applying the diversion operating criteria
  • Bypass Flow Minimum
  • Combined south and north Delta SWP diversion daily cap
  • Diversion Flow Fraction Limit
  • Flow Reversal Minimization
  • June Diversion Limit
  • Larval Distribution Operational Scenario
  • Limits on shifting exports from south Delta to north Delta during balanced conditions
  • No additional upstream stored water releases for north Delta diversion
  • No Diversion When the Delta Cross Channel Gates Are Open
  • No north Delta diversion during balanced conditions at low south Delta exports
  • Phase 1 Operations Limit
  • Phase 2 Operations Limit
  • Salmon presence off-ramp from spring operating criteria
Fish guidance systems3
  • Convene Fish Guidance System Working Group
  • Develop Fish Guidance System Study Plan
  • Submit Fish Guidance System Recommendation Report to CDFW
Fish screens18
  • Adjust and Retest Fish Screen Baffles After a Non-Compliant Test
  • Complete COA 10.25 Series Models and Report
  • Conduct North Delta Intake Fish Screen Hydraulic Tests
  • Develop Refugia Design and Field Study Plan
  • Implement Fish Screen Impingement Study
  • Inspect Sediment Deposition at Intake Tee Screens Annually
  • Notify CDFW of Non-Operational Fish Screens
  • Remove and Clean North Delta Intake Fish Screens
  • Report Intake Sediment Deposition Assessment to CDFW
  • Retest Fish Screen Hydraulics After a Qualifying Event
  • Submit Fish Screen Hydraulic Testing Data and Report to CDFW
  • Submit Hydraulic Testing Plan for Intake Fish Screens
  • Submit Screen Impingement Study Plan
  • Approach Velocity Maintenance
  • Diversion Spreading Across Screens
  • Fish Screen Velocity Criteria
  • Unscreened Diversion Prohibition
  • Visual inspection of intake fish screens for integrity, cleaning and impingement
Hydraulic and sediment models2
  • Complete Hydraulic and Sediment Transport Modeling Report
  • Submit Final Hydraulic and Sediment Models and Reports to CDFW
Operations coordination and data10
  • Develop Real-Time Information Sharing Process with CDFW
  • Install Real-Time Water Quality Monitoring Station
  • Provide NDDMT Raw Data and Modeling to CDFW on Request
  • Share Phase 1 Operations Data with CDFW
  • Submit North Delta Diversion Monitoring Team Charter
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • Resolution and implementation of real-time operations decisions
  • Weekly operations risk assessment content
Operations monitoring and studies19
  • Complete Sacramento River Hydrograph Limb Impact Evaluation
  • Conduct Baseline Food Web Resource Surveys
  • Conduct Ecological Response Evaluation Studies
  • Conduct Fisheries Evaluation Studies for Covered Fish
  • Conduct Sacramento River Bathymetric Surveys Near the Intakes
  • Conduct Water Quality Evaluation Studies
  • Develop Covered Fish Species Abundance and Distribution Study Plan
  • Develop Migration and Survival Study Plan
  • Develop Predation Study Plan
  • Develop Sediment and Turbidity Monitoring Study Plan
  • Develop Sediment Reintroduction Plan
  • Fund and Implement the DS/LFS Spawning Habitat Study
  • Implement Covered Fish Species Monitoring and Science Program
  • Report Bathymetric Survey Results to CDFW
  • Submit Covered Fish Species Monitoring and Science Plan
  • Assessment of juvenile salmon route entrainment by reach and junction
  • Covered fish monitoring across baseline, construction and operations periods
  • Food web and larval fish entrainment study
  • Modeling of operations effects on Delta smelt habitat in Suisun Marsh and Grizzly Bay
Unfiled7
Needs a home7
  • Deliver Annual Status Report to CDFW
  • Incorporate Litter and Erosion Control Language in Contractor Contracts
  • Install wildlife under-crossing culverts and speed limit signage
  • Report Construction-Phase CBB and MALI Survey Results
  • Report GPS-Recorded CBB Nest and MALI Locations to CDFW
  • Report MALI and CTS Finds to the Designated Biologist
  • Submit Preconstruction Survey Results for CDFW Approval