QA

Annual Report Structure

105

Danger Zone

Delete this Compliance Index List

Once you delete this list, it will delete all of its metadata and relationships to associated items. There is no going back. Please be certain.

Air quality14
Fugitive dust14
  • Plant Vegetative Ground Cover on Disturbed Areas
  • Submit Fugitive Dust Control and Monitoring Plan
  • Access Route Surface Stabilization
  • Dryer and Conveyor Enclosure
  • Dust Complaint Sign
  • Fugitive Dust Suppression
  • Haul Truck Cover and Freeboard
  • Inactive Area Stabilization
  • Prompt Paving After Grading
  • Stabilized Construction Entrances
  • Stockpile Tackifier Application
  • Tire Wash Stations
  • Track-Out Removal
  • Wind Breaks
Amphibians and reptiles53
Amphibians31
  • Conduct and Report Annual CTS Surveys
  • Conduct CTS Walking Clearance Survey Before Ground Disturbance
  • Conduct daily clearance surveys before work begins
  • Consult CDFW on Non-Native or Hybrid Salamander Measures
  • Report Barred Tiger Salamander or Hybrid Detections to CDFW
  • Submit CTS Relocation Plan
  • Submit Preconstruction CTS Burrow Watering Protocol
  • Biological monitoring of initial grading and excavation
  • Biologist presence during site selection, access and set-up
  • Biologist survey before work resumes after rain
  • Breeding habitat no-activity buffer
  • Burrow avoidance
  • Burrow Avoidance
  • Burrow monitoring when night lighting spills toward habitat
  • Burrow release protocol
  • Clearance survey after barrier repair
  • Daily burrow check before work starts
  • Habitat disturbance work window
  • Habitat Disturbance Work Window
  • Hand excavation of burrows in the trench alignment
  • Morning survey after burrow watering
  • Mowing pattern
  • Mowing Pattern
  • Night Work Prohibition After Construction
  • No-Activity Buffer Around Occupied Burrows
  • No-activity buffer around occupied burrows and refugia
  • Occupied burrow no-activity buffer
  • Presence surveys before and during each work day
  • Presence surveys before and during each work day
  • Site survey before work on days with rain forecast
  • Yearly site assessment of the active season
Giant garter snake22
  • Block burrows after confirming vacancy
  • Conduct and Report Annual GGS Surveys
  • Conduct GGS Survey Before Exclusion Fencing Installation
  • Conduct Post-Dewatering GGS Clearance Survey
  • Dewater aquatic habitat and hold the dry period
  • Install ESA fencing and identification signage
  • Submit GGS Relocation Plan
  • Submit Habitat Disturbance Footprint and ESAs for CDFW Approval
  • Avoidance of Federally Listed Species
  • Canal bank disturbance avoidance
  • Canal Bank Disturbance Avoidance
  • Canal excavation limited to one side
  • Canal Spoils Placement
  • Daily inspection of environmentally sensitive area markings
  • ESA demarcation observed
  • Flagging of suitable upland habitat at work sites
  • In-Channel Work Window
  • Investigation of burrows for occupancy
  • Maintenance Ground Disturbance Limit
  • Resurvey after a lapse in covered activities
  • Staging Area Setback from Habitat
  • Suitable habitat delineation maintained
Birds54
Bird strike diverters1
  • Submit Bird Strike Diverter Location and Type Plan
Nesting birds53
  • Conduct and Report Annual SWHA Nest Tree Surveys
  • Conduct and Report Preconstruction SWHA Nest Monitoring
  • Conduct Annual TRBL Survey During Construction
  • Conduct Baseline TRBL Habitat Assessment
  • Conduct Nesting-Season SWHA Survey Before Field Investigations
  • Conduct Preconstruction SWHA Nest Tree Survey
  • Conduct Preconstruction TRBL Breeding-Colony Surveys
  • Conduct Preconstruction TRBL Habitat Survey
  • Conduct Preconstruction TRBL Roosting-Habitat Surveys
  • Delineate and sign occupied nest and roost buffers
  • Map and Submit Nesting, Foraging and Roosting Sites to CDFW
  • Notify CDFW of Nest Survey Results Before Vegetation Removal
  • Notify CDFW of SWHA Nest Abandonment or Distress
  • Notify CDFW of TRBL Colony or Roost Disturbance
  • Notify Designated Representative of SWHA Nest Distress
  • Obtain CDFW Approval of a Reduced SWHA Nest Buffer
  • Obtain CDFW Approval to Remove or Trim a Known Nest Tree
  • Obtain CDFW Approval to Work During the SWHA Nesting Season
  • Plant Replacement Swainson's Hawk Nest Trees
  • Submit Buffer Zone Designs and Locations for CDFW Approval
  • Submit Preconstruction TRBL Survey Results to CDFW
  • Submit SWHA Relocation Plan
  • Submit TRBL Relocation Plan
  • Active colony buffer
  • Biologist stop-work authority for distressed nesting birds
  • Break areas out of nest line of sight
  • Break areas outside buffers
  • Daily monitoring of an active colony near work
  • Daily monitoring of an occupied roost site near work
  • Daylight work limit near nests
  • Disruptive Activity Timing
  • Distance-tiered nest observation during covered activities
  • Equipment staging out of nest line of sight
  • Helicopter buffer from colonies
  • Helicopter Daylight Limit
  • Helicopter setback from nests
  • Irrigation and maintenance of replacement nest trees
  • Mixed flock roost occupancy presumption
  • Monitoring of replacement nest trees
  • Nest tree removal avoidance
  • Nest Tree Removal Avoidance
  • Nesting season work restriction
  • No contact with occupied nest trees
  • No exiting vehicles within buffers
  • No physical contact with colonies
  • No removal of occupied nest trees
  • Occupancy checks of unoccupied roost sites during work
  • Occupied nest no-activity buffer
  • Occupied roost buffer
  • Replacement nest tree survival standard and replanting
  • Response to colonization adjacent to work
  • Siting of replacement nest sites
  • Stop work on signs of distress
Fish17
Aquatic habitat mitigation3
  • Coordinate with CDFW on Mitigation Site Selection and Design
  • Site, Design and Restore Construction Mitigation Habitat for Covered Fish
  • Site, Design and Restore Operations Mitigation Habitat for Covered Fish
Chinook salmon1
  • Coordinate Annual Selection of CHNWR and CHNSR Funded Projects
Delta smelt and longfin smelt2
  • Contribute Funding to the Longfin Smelt Culture Program
  • Develop CDFW-Approved Spring LFS Operational Scenario
Fish rescue and salvage9
  • Complete fish salvage and relocation before in-water work
  • Notify CDFW Before Dewatering or Fish-Isolating Work
  • Notify CDFW When Fish Salvage Is Complete
  • Submit Fish Salvage Plan
  • Train and Staff Fish Salvage Teams Before Site Access
  • Dead Specimen Preservation
  • Fisheries biologist present to rescue fish during dewatering
  • Preservation and delivery of dead covered fish
  • Preservation and delivery of dead covered specimens
White sturgeon2
  • Complete WS Life Cycle Model Re-Evaluation Report
  • Fund and Complete White Sturgeon Mitigation Projects
Habitat protection64
Exclusion fencing and ESAs17
  • Delineate Covered Species Habitat and Fence Construction Sites
  • Delineate habitat, buffers, and construction site boundaries
  • Flag and Sign Cross-Country Access Routes
  • Flag Burrows and Habitat Features Before Earthmoving
  • Install exclusion barriers at work areas and shaft openings
  • Remove exclusion barriers after covered activities end
  • Submit Exclusion Barrier Design and Locations to CDFW
  • Biological monitoring during exclusion barrier installation
  • Exclusion barrier construction specification
  • Exclusion fencing gate closure
  • Exclusion fencing in place during covered activities
  • Exclusion Fencing Inspection and Repair
  • Exclusion fencing repair
  • Habitat and buffer markers maintained
  • Inspection and reporting of habitat fencing, stakes and flags
  • Refuge cover along exclusion fencing
  • Vegetation maintenance along exclusion fencing
Habitat avoidance and work footprint9
  • Conduct Habitat Evaluation Field Survey
  • Avoidance Measures in Unmapped Habitat
  • Conservation Easement Buffer
  • Geotechnical investigation avoidance of aquatic features
  • No Disturbance of CDFW Conserved Lands
  • Suitable habitat avoidance
  • Suitable Habitat Avoidance
  • Work footprint limit
  • Work Footprint Limit
Vegetation removal15
  • Obtain CDFW Approval of Mowing or Clearing Equipment
  • Biologist presence during vegetation management
  • Channel bank mowing limits
  • Emergent vegetation left unmowed
  • Emergent Vegetation Mowing Avoidance
  • Hand Tool Trimming of Protected Vegetation
  • Mower blade height
  • Mower Blade Height
  • Mowing Timing Limit
  • Mowing timing limits
  • Upland Discing Prohibition
  • Vegetation Removal Minimization
  • Vegetation removal minimized
  • Vegetative Material Disposal
  • Woody Vegetation Removal Window
Wildlife encounters and handling16
  • Excavate and collapse burrows ahead of trenching
  • Pay Care and Treatment Costs for Injured Covered Species
  • Care and authorized release of covered species taken into captivity
  • Care of covered species injured by covered activities
  • Care of injured covered species
  • Care of Injured Covered Species
  • Covered species capture and handling
  • Covered Species Capture and Handling
  • Covered Species Encounter Reporting to the Biologist
  • Covered species relocation
  • Covered Species Relocation
  • Injured Wildlife Rehabilitation Transport
  • Monitoring record of covered species capture and relocation
  • Wildlife encounter response
  • Wildlife Encounter Response
  • Work Stoppage on Covered Species Encounter
Wildlife entrapment7
  • Cover open excavations at the close of each working day
  • Biologist inspection and presence when excavations are filled or covered
  • Debris Pile Removal
  • Inspection of stored pipes, culverts and similar structures for wildlife
  • Morning inspection of overnight equipment, materials and excavations for trapped wildlife
  • Wildlife check of idle vehicles and equipment before moving
  • Wildlife in stored materials response
Hazards40
Fire prevention3
  • Fire Suppression Supplies On Site
  • Vegetation clearing method for fire prevention
  • Vegetation Clearing Method for Fire Prevention
Hazardous materials13
  • Develop Hazardous Materials Management Plan
  • Develop Spoils and Dredged Material Disposal Plan
  • Obtain CDFW Permission for Hazardous Material Use Near Streams
  • Prepare the hazardous materials management plan
  • Submit Hazardous Materials Management Plan to CDFW
  • Concrete Washwater Containment
  • Contaminated Soil Segregation and Removal
  • Database of historic contamination and hazardous materials inspections
  • Hazardous Materials Container Labeling
  • Hazardous Materials in Designated Storage
  • Hazardous Materials Storage Duration Limit
  • Material Safety Data Sheets provided to site personnel
  • Petroleum Storage Containment
Pesticides and rodenticides8
  • Obtain CDFW Approval for Pesticide and Herbicide Use
  • Submit Fertilizer Application Plan
  • Submit Fertilizer Application Plan for CDFW Approval
  • Submit Herbicide and Pesticide Application Plan
  • Licensed Pesticide Applicator
  • Pesticide Application Wind Limit
  • Pesticide Setback from Aquatic Habitat
  • Rodenticide and Poison Prohibition
Refueling and equipment servicing5
  • Daily contaminant leak check and maintenance of vehicles and equipment
  • Daily inspection of equipment in contact with water for petroleum leaks
  • Fuel Transfer Containment
  • Refueling Practices
  • Refueling Setback from Water
Spill prevention and response11
  • Conduct Spill Response and Containment Training
  • Develop Spill Prevention, Control, and Countermeasure Plan
  • Notify CDFW of an Accidental Spill
  • Report Vessel Fuel Spills to CDFW OSPR
  • Submit Spill Prevention, Control, and Countermeasure Plan to CDFW
  • Equipment Cleaning Before Water Contact
  • Oil Absorbent Booms in Place
  • Spill Containment and Response
  • Spill Kits On Site
  • Spill Response
  • Staging Area Spill Containment
Lighting5
Lighting near habitat and waters5
  • Install visual barriers along night access routes
  • Access road location assessment before visual barrier installation
  • Intake Lighting Restricted from the River Channel
  • Lighting Color Near Habitat
  • Night Lighting Spill Control
Noise and vibration20
Pile driving and underwater sound18
  • Conduct hydroacoustic monitoring during in-water pile driving
  • Report Hydroacoustic and Pile Driving Monitoring Results
  • Report Hydroacoustic Threshold Exceedances to CDFW
  • Submit In-Water Pile Driving Information to CDFW
  • Submit Pile Driving Plan
  • Submit Underwater Sound Abatement Plan
  • Continual hydroacoustic monitoring of in-water work
  • Escape route during multiple pile driver operation
  • Hours of the day for pile driving
  • Impact pile driving limits
  • Pile Driving Hour Limit
  • Pile driving noise attenuation
  • Pile driving soft start
  • Shoulder-season pile driving restrictions
  • Underwater noise disturbance threshold outside the construction work window
  • Underwater noise threshold outside the work window
  • Underwater noise threshold within the work window
  • Watch for distressed or injured fish during pile driving
Vibration2
  • Implement CDFW-Approved Subsurface Vibration Study
  • Submit Subsurface Testing and Monitoring Study Plan
People and qualifications14
Designated biologists and monitors10
  • Conduct Baseline Invasive Plant Survey
  • Obtain CDFW Approval of a Substitute Biologist or Monitor
  • Submit Annual Biologist Reapproval List to CDFW
  • Submit Biologist Resume Forms to CDFW Before Each Phase
  • Approved Wildlife Handler
  • Biological Monitor qualifications and permitted scope
  • Biologist or monitor on site during take-risk construction activities
  • Designated Biologist and Fisheries Biologist qualifications and responsibilities
  • Handling and relocation restricted to the approved Designated Biologist
  • Stop-work authority of biologists and monitors
Qualified specialists2
  • Notify CDFW of the Designated Representative and Substitutes
  • Permitted personnel for studies that may take Covered Fish Species
Worker training2
  • Conduct Worker Education Program and Annual Refresher Training
  • Train Tugboat and Barge Operators on Habitat Impacts
Plants and invertebrates28
Bumble bees and monarchs19
  • Conduct Annual CBB Flight Season Surveys
  • Conduct Pre-Activity CBB Foraging and Nest Surveys
  • Conduct Preconstruction CBB Habitat Survey
  • Notify CDFW of a CBB Detection
  • Obtain agency approval of designated wildlife handlers
  • Report CBB Sightings to the Designated Biologist
  • Submit CBB Buffer Zone Design Plan
  • Submit CBB Nest Relocation Plan
  • Active nest buffer
  • Daily visual sweeps for bee flight activity during work
  • Flowering Vegetation Removal Timing
  • Inspection and supervision of refugia removal during overwintering
  • Monitoring of a relocated nest
  • Overwintering Habitat Disturbance Avoidance
  • Relocation as a last resort under the approved protocol
  • Search for the active nest when a bee is detected on site
  • Stop work on covered species discovery
  • Underground refugia buffer
  • Vegetation removal clearance near refugia
Special-status plants9
  • Conduct Annual MALI Surveys in Suitable Habitat
  • Conduct Preconstruction MALI Survey
  • Report CTS and MALI Relocations to CDFW
  • Submit MALI Translocation Plan
  • Avoidance of covered plant removal
  • Covered Plant Removal Avoidance
  • Levee Landside Line Maintenance
  • Post-disturbance grading to elevations and hydrology suitable for covered plants
  • Special-status plant occurrence buffer
Site conduct35
Access routes and parking6
  • Obtain CDFW Approval to Construct Off-Site Travel Routes
  • Equipment Confined to Access Routes
  • Equipment confined to designated access routes
  • Equipment Storage Setback from Aquatic Habitat
  • Staging Area Confinement
  • Use of Established Access Routes
Agency and biologist access6
  • Agency access to construction sites
  • CDFW access to the Project and mitigation lands
  • Construction-monitoring documentation kept on site
  • No agreements restricting contractor or biologist communication with CDFW
  • Unfettered biologist access to the Project Site
  • Wallet card or fact sheet carried by workers in the Project Area
Compliance inspections and records4
  • Develop Environmental Compliance Monitoring Plan per Site
  • Submit Monthly Compliance Report to CDFW
  • Daily biologist compliance inspection at each construction site and maintenance activity
  • Daily written observation and inspection record
Facility design and siting6
  • Install Bird Strike Diverters on New Transmission Lines
  • Submit Culvert Under-Crossing Count and Location Report
  • Annual inspection and replacement of bird strike diverters
  • Bird Strike Diverter Maintenance
  • Power line and support structure siting away from covered species habitat
  • Roadway design passable by covered species
Pets, firearms and campfires1
  • No Pets, Campfires or Firearms On Site
Speed limits6
  • Nighttime Speed Limit
  • Paved Road Speed Limit
  • Speed Limit Near Habitat
  • Speed Limit Posting
  • Unpaved Road Speed Limit
  • Wildlife Crossing Signage
Trash and food waste4
  • Covered Food Waste Containers
  • Trash Abatement
  • Trash Load Covering
  • Trash Removal Cadence
Work hours2
  • Daytime Work Hour Limit
  • Night Vehicle Travel Caution
Water65
Barge and vessel operations9
  • Report Vessel Groundings and Barge Plan Deviations to CDFW
  • Submit Barge Operations Plan
  • Barge Mooring and Anchoring
  • Biological monitoring of barge operations
  • Propeller Wash Limit
  • Vessel Deck Loose Material Containment
  • Vessel Navigation Regulation Compliance
  • Vessel Speed and Wake Limit
  • Vessel Spill Kits Onboard
Dewatering6
  • Submit Dewatering Plan
  • Biologist present to salvage snakes during dewatering
  • Dewatering Pump Intake Screening
  • Dewatering pump shutdown
  • Dewatering rate limit
  • Dewatering Window
Erosion and sediment control24
  • Install Erosion and Sediment Control Measures Before Earth-Moving
  • Install erosion and sediment controls ahead of storms
  • Obtain CDFW Approval of Erosion Control Stabilization Measures
  • Submit Erosion and Sediment Control Plan
  • Damaged Pavement Repaving
  • Emergency Erosion Control Supplies On Site
  • Erosion Control in Place Before Storms
  • Erosion control inspection before, during and after storms
  • Erosion Control Material Standard
  • Ground Disturbance Minimization
  • Grubbed Material Disposal
  • Inspection of erosion controls before, during and after rain events
  • Monitoring of the 72-hour weather forecast for each project site
  • Monofilament Netting Prohibition
  • Precipitation Work Limit
  • Runoff and Drainage Control
  • Sediment Control Measures
  • Sizing, siting and protection of spoils and RTM storage sites
  • Spoils Storage Site Siting
  • Stockpile Placement and Covering
  • Storm Onset Work Restriction
  • Vegetation Retention for Erosion Control
  • Wind Erosion Control
  • Work limits during precipitation
Geotechnical exploration1
  • Submit Over-Water Geotechnical Exploration Description to CDFW
Groundwater3
  • Disclose Detected Wells in the Construction Phase Package
  • Submit Groundwater Testing and Monitoring Plan
  • Submit Underground Well Detection Plan
In-water work3
  • Daily In-Water Work Limit
  • In-Water Work Window During Construction
  • In-Water Work Window During Pre-Construction
Invasive species10
  • Clean and decontaminate equipment at each work site
  • Conduct Annual Invasive Plant Survey
  • Report Invasive Aquatic Species Detections to CDFW
  • Submit Invasive Plant Species Monitoring, Management and Control Plan
  • Invasive Animal Removal
  • Invasive plant removal methods in restoration areas
  • Invasive species inspection of in-water equipment before deployment
  • Invasive Species Spread Prevention
  • Pathogen Spread Prevention BMPs
  • Predatory Species Introduction Prohibition
Stormwater and discharges5
  • Prepare Stormwater Pollution Prevention Plan
  • Submit Stormwater Pollution Prevention Plan to CDFW
  • Upload Stormwater Forms and Records to SMARTS
  • Non-Stormwater Discharge Prevention
  • Reusable Tunnel Material Drainage Discharge
Water quality4
  • Conduct Baseline and Annual In-Water Mercury Monitoring
  • Develop and Implement Methylmercury Management Approach
  • Report Mercury Monitoring Results to CDFW
  • Submit Mercury Management and Monitoring Plan
Water operations79
Biological performance criteria7
  • Develop Real-Time Biological Criteria Compliance Model
  • Obtain CDFW Approval of Biological Criteria Compliance Models
  • Biological criterion on entrainment, survival and abundance reduction
  • Biological criterion on population growth rate
  • Covered Fish Species Biological Criteria met during operations
  • Funding and data support for Covered Fish Species life cycle models
  • No entrainment of juvenile salmon at the north Delta intakes
Diversion limits and bypass flows20
  • Complete Joint Operations Optimization Study
  • Develop Hydraulic Data Plan for Operating Criteria
  • Prepare Weekly Operating-Criteria Risk Assessment Report
  • Submit Joint Operations Optimization Study Plan
  • Additional Suisun Marsh Salinity Control Gate operating days for Delta smelt habitat
  • Annual Operating Criteria Schedule
  • Annual schedule for applying the diversion operating criteria
  • Bypass Flow Minimum
  • Combined south and north Delta SWP diversion daily cap
  • Diversion Flow Fraction Limit
  • Flow Reversal Minimization
  • June Diversion Limit
  • Larval Distribution Operational Scenario
  • Limits on shifting exports from south Delta to north Delta during balanced conditions
  • No additional upstream stored water releases for north Delta diversion
  • No Diversion When the Delta Cross Channel Gates Are Open
  • No north Delta diversion during balanced conditions at low south Delta exports
  • Phase 1 Operations Limit
  • Phase 2 Operations Limit
  • Salmon presence off-ramp from spring operating criteria
Fish guidance systems3
  • Convene Fish Guidance System Working Group
  • Develop Fish Guidance System Study Plan
  • Submit Fish Guidance System Recommendation Report to CDFW
Fish screens18
  • Adjust and Retest Fish Screen Baffles After a Non-Compliant Test
  • Complete COA 10.25 Series Models and Report
  • Conduct North Delta Intake Fish Screen Hydraulic Tests
  • Develop Refugia Design and Field Study Plan
  • Implement Fish Screen Impingement Study
  • Inspect Sediment Deposition at Intake Tee Screens Annually
  • Notify CDFW of Non-Operational Fish Screens
  • Remove and Clean North Delta Intake Fish Screens
  • Report Intake Sediment Deposition Assessment to CDFW
  • Retest Fish Screen Hydraulics After a Qualifying Event
  • Submit Fish Screen Hydraulic Testing Data and Report to CDFW
  • Submit Hydraulic Testing Plan for Intake Fish Screens
  • Submit Screen Impingement Study Plan
  • Approach Velocity Maintenance
  • Diversion Spreading Across Screens
  • Fish Screen Velocity Criteria
  • Unscreened Diversion Prohibition
  • Visual inspection of intake fish screens for integrity, cleaning and impingement
Hydraulic and sediment models2
  • Complete Hydraulic and Sediment Transport Modeling Report
  • Submit Final Hydraulic and Sediment Models and Reports to CDFW
Operations coordination and data10
  • Develop Real-Time Information Sharing Process with CDFW
  • Install Real-Time Water Quality Monitoring Station
  • Provide NDDMT Raw Data and Modeling to CDFW on Request
  • Share Phase 1 Operations Data with CDFW
  • Submit North Delta Diversion Monitoring Team Charter
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • North Delta Diversion Monitoring Team membership and meeting cadence
  • Resolution and implementation of real-time operations decisions
  • Weekly operations risk assessment content
Operations monitoring and studies19
  • Complete Sacramento River Hydrograph Limb Impact Evaluation
  • Conduct Baseline Food Web Resource Surveys
  • Conduct Ecological Response Evaluation Studies
  • Conduct Fisheries Evaluation Studies for Covered Fish
  • Conduct Sacramento River Bathymetric Surveys Near the Intakes
  • Conduct Water Quality Evaluation Studies
  • Develop Covered Fish Species Abundance and Distribution Study Plan
  • Develop Migration and Survival Study Plan
  • Develop Predation Study Plan
  • Develop Sediment and Turbidity Monitoring Study Plan
  • Develop Sediment Reintroduction Plan
  • Fund and Implement the DS/LFS Spawning Habitat Study
  • Implement Covered Fish Species Monitoring and Science Program
  • Report Bathymetric Survey Results to CDFW
  • Submit Covered Fish Species Monitoring and Science Plan
  • Assessment of juvenile salmon route entrainment by reach and junction
  • Covered fish monitoring across baseline, construction and operations periods
  • Food web and larval fish entrainment study
  • Modeling of operations effects on Delta smelt habitat in Suisun Marsh and Grizzly Bay
Unfiled7
Needs a home7
  • Deliver Annual Status Report to CDFW
  • Incorporate Litter and Erosion Control Language in Contractor Contracts
  • Install wildlife under-crossing culverts and speed limit signage
  • Report Construction-Phase CBB and MALI Survey Results
  • Report GPS-Recorded CBB Nest and MALI Locations to CDFW
  • Report MALI and CTS Finds to the Designated Biologist
  • Submit Preconstruction Survey Results for CDFW Approval
Selected: 0
Index description

Requirements 0
In the Compliance Index
    Help & Guidance

    Beacon

    On this page

    Terms

    Page