QA

Obligation Tracking

Notify only
A duty reaches this view when an event leaves somebody owing a notice — class Notify, and only Notify. Monitor is a standing cadence — something that is ON rather than owed, which is why it reaches you by being pinned rather than by appearing here. Adhere is a rule you comply with, and Roster is a standing qualification. This permit drafted 3 Notify duties out of333, against 64 Monitor — which is why this view is short. The hand-built registry of the same permits had 50 notices; nobody has yet checked whether the drafting pass routes them to Actions instead.
Pins are authored
Beacon has no pin table, so these 6 are a stand-in for a reader's own selection. What each pin then shows is real: the events that reached it are the same matches the other views run. This view replaced Ongoing, which listed what was in force by authoring which activities were under way — none of the 333 obligations records that it is currently live, so the page no longer claims to know.
Agency reporting and approvals2
Species sightings and CNDDB reporting1
  • NotifyBiological Monitor daily communication and immediate reports to the Designated Biologist1
    • COA 9.2.2Report Daily to Designated Biologist and Flag Non-Compliance
Take and injury reporting1
  • AdhereCarcass salvage, labeling and storage for the wildlife health lab1
    • COA 11.103Salvage and Label CBB Carcass for CDFW Lab
Air quality12
Fugitive dust12
  • AdhereAccess Route Surface Stabilization1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereDryer and Conveyor Enclosure1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereDust Complaint Sign1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereFugitive Dust Suppression3
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
    • COA 11.55Implement Dust Control to Preserve GGS Monitoring Visibility
    • COA 11.69Apply Dust Control to Maintain Visibility for SWHA Monitoring
  • AdhereHaul Truck Cover and Freeboard1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereInactive Area Stabilization1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdherePrompt Paving After Grading1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereStabilized Construction Entrances1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereStockpile Tackifier Application1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereTire Wash Stations1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereTrack-Out Removal1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
  • AdhereWind Breaks1
    • COA 11.29Implement Construction-Area Fugitive Dust BMPs
Amphibians and reptiles38
Amphibians24
  • MonitorBiological monitoring of initial grading and excavation4
    • COA 11.42Monitor Initial Grading and Excavation for CTS
    • COA 11.48Monitor CTS Hiding Spots Onsite During Clearance Work
    • COA 11.62.1Monitor for GGS On Site During Ground-Disturbing Activities
    • COA 11.63Monitor Clearing Site Daily for Emerging and Sheltering GGS
  • MonitorBiologist presence during site selection, access and set-up3
    • COA 11.41Station Biologist During Site Selection, Access and Set-Up
    • COA 11.55Biologist Guides Project Access and Work Around ESAs
    • COA 11.65Guide Site Access and Conduct Daily Burrow Surveys in Upland Habitat
  • MonitorBiologist survey before work resumes after rain1
    • COA 11.13Survey Site for Clearance Before Resuming After Rain
  • AdhereBreeding habitat no-activity buffer1
    • COA 11.40Demarcate 300-Foot No-Activity Buffer Around CTS Breeding Habitat
  • AdhereBurrow avoidance2
    • COA 11.49Avoid Disturbing Burrows Outside Direct-Disturbance Areas
    • COA 11.62Avoid or Hand-Excavate Burrows During Barrier Installation
  • AdhereBurrow Avoidance2
    • COA 11.56Avoid Disturbing Known or Potentially Occupied Burrows
    • COA 11.62.2Avoid Disturbing Known or Potentially Occupied Burrows
  • MonitorBurrow monitoring when night lighting spills toward habitat1
    • COA 11.47Survey Burrows and Halt Work on Night-Lighting Spillover
  • AdhereBurrow release protocol1
    • COA 11.51.2Release Relocated CTS Into Suitable Burrows One at a Time
  • MonitorClearance survey after barrier repair2
    • COA 11.43Conduct Clearance Survey Before Reinitiating Activities After Barrier Repair
    • COA 11.62Survey and Re-Search the Barrier Line After Repair
  • MonitorDaily burrow check before work starts2
    • COA 11.41Conduct Daily Preconstruction Burrow Surveys
    • COA 11.65Guide Site Access and Conduct Daily Burrow Surveys in Upland Habitat
  • AdhereHabitat disturbance work window1
    • COA 11.40Restrict Unavoidable Breeding-Habitat Work to the Dry Season
  • AdhereHabitat Disturbance Work Window2
    • COA 11.44Limit Ground-Disturbing Work to CTS Dry-Season Window
    • COA 11.58Confine Ground-Disturbing Work to the GGS Active Period
  • AdhereHand excavation of burrows in the trench alignment1
    • COA 11.62Avoid or Hand-Excavate Burrows During Barrier Installation
  • MonitorMorning survey after burrow watering1
    • COA 11.42.1Conduct Morning Survey and Relocate CTS After Burrow Watering
  • AdhereMowing pattern1
    • COA 11.42.2Mow in a Non-Concentrating Pattern During Dry Daytime Conditions
  • AdhereMowing Pattern1
    • COA 11.57Mow in Rows Directed Away From Concentrating Animals
  • AdhereNight Work Prohibition After Construction1
    • COA 11.7Prohibit Non-Emergency Night Work in CTS Habitat After Construction
  • AdhereNo-Activity Buffer Around Occupied Burrows1
    • COA 11.55Report GGS Encounters and Establish Refuge No-Activity Buffer
  • AdhereNo-activity buffer around occupied burrows and refugia1
    • COA 11.65Guide Site Access and Conduct Daily Burrow Surveys in Upland Habitat
  • AdhereOccupied burrow no-activity buffer4
    • COA 11.39Maintain No-Activity Buffer Around CTS Refuge Sites
    • COA 11.41Flag Occupied Burrows With 75-Foot No-Activity Buffers
    • COA 11.49.1Establish 75-Foot No-Activity Buffer Around Flagged Burrows
    • COA 11.62.1Establish and Respect No-Activity Buffers Around Flagged Burrows
  • MonitorPresence surveys before and during each work day1
    • COA 11.63Monitor Clearing Site Daily for Emerging and Sheltering GGS
  • MonitorPresence surveys before and during each work day1
    • COA 11.48Conduct CTS Surveys Before and During Each Workday
  • MonitorSite survey before work on days with rain forecast1
    • COA 11.45Survey Project Site Before Work on Rain-Forecast Days
  • MonitorYearly site assessment of the active season1
    • COA 11.46Assess CTS Active Season Yearly at Each Construction Site
Giant garter snake14
  • AdhereAvoidance of Federally Listed Species1
    • COA 11.54Avoid Environmentally Sensitive Areas During Construction
  • AdhereCanal bank disturbance avoidance1
    • COA 11.60Operate Equipment from Bank Top and Limit Excavation to One Side Per Year
  • AdhereCanal Bank Disturbance Avoidance2
    • COA 11.60Leave Canal Banks Undisturbed
    • COA 11.60Retain Vegetation on Levees and Canal Sides
  • AdhereCanal excavation limited to one side1
    • COA 11.60Operate Equipment from Bank Top and Limit Excavation to One Side Per Year
  • AdhereCanal Spoils Placement2
    • COA 11.60Haul or Place Dredged Material Away from GGS Cover Features
    • COA 11.60Place Canal-Clearing Spoils Away from Bank Tops
  • MonitorDaily inspection of environmentally sensitive area markings1
    • COA 11.54Inspect ESA Stakes and Poly Wire Before Each Workday
  • AdhereESA demarcation observed1
    • COA 11.65Delineate and Avoid Suitable Aquatic GGS Habitat
  • MonitorFlagging of suitable upland habitat at work sites1
    • COA 11.65Delineate Suitable Upland GGS Habitat at Work Sites
  • AdhereIn-Channel Work Window1
    • COA 11.60Confine In-Channel Work to the Inactive-Season Window and Scope
  • MonitorInvestigation of burrows for occupancy1
    • COA 11.56Investigate Burrows for GGS Occupancy
  • AdhereMaintenance Ground Disturbance Limit1
    • COA 11.65Perform Maintenance Without Crushing or Entombing GGS in Burrows
  • MonitorResurvey after a lapse in covered activities1
    • COA 11.56Resurvey After a Lapse in Covered Activities
  • AdhereStaging Area Setback from Habitat2
    • COA 11.55Keep Staging, Parking and Stockpiles Away from Suitable Habitat
    • COA 11.69Confine Parking, Staging and Surface-Disturbing Activities to the Project Site
  • MonitorSuitable habitat delineation maintained1
    • COA 11.78Delineate and Avoid SWHA Nesting Habitat at Preconstruction Sites
Birds30
Nesting birds30
  • AdhereActive colony buffer4
    • COA 11.85Maintain a 1,300-Foot No-Activity Buffer Around an Unavoidable Active TRBL Colony
    • COA 11.85Reduce the TRBL Colony Buffer to 300 Feet With CDFW Approval Where Site Conditions Qualify
    • COA 11.86Prohibit Covered Activities Within the Nest Disturbance Buffer
    • COA 11.90Restrict Activities Outside Delineated Habitat/Buffers
  • MonitorBiologist stop-work authority for distressed nesting birds1
    • COA 11.75Continue Monitoring Until CDFW Confirms Normalized SWHA Behavior
  • AdhereBreak areas out of nest line of sight1
    • COA 11.74Keep Break Areas and Idle Equipment Out of Nest Sightlines
  • AdhereBreak areas outside buffers1
    • COA 11.89Prohibit Employee Break, Rest, or Meeting Areas Within or Adjacent to No-Activity Buffers
  • MonitorDaily monitoring of an active colony near work1
    • COA 11.86Monitor an Active TRBL Colony Daily Through the Nesting Season
  • MonitorDaily monitoring of an occupied roost site near work1
    • COA 11.88Monitor Occupied Roost Sites Within the 300-Foot Buffer Daily
  • AdhereDaylight work limit near nests2
    • COA 11.73Limit Work to Daylight Hours Near Occupied SWHA Nest
    • COA 11.82Restrict Work Hours Near Occupied TRBL Colony or Roost
  • AdhereDisruptive Activity Timing1
    • COA 11.82Coordinate Timing of Disruptive Activities Away From Vulnerable TRBL Periods
  • MonitorDistance-tiered nest observation during covered activities2
    • COA 11.73Monitor SWHA Nest Status at Tiered Distances During Construction
    • COA 11.75Extend Nest Monitoring to Newly Discovered SWHA Nests
  • AdhereEquipment staging out of nest line of sight1
    • COA 11.74Keep Break Areas and Idle Equipment Out of Nest Sightlines
  • AdhereHelicopter buffer from colonies1
    • COA 11.91Maintain Helicopter Distance/Time Buffers Near TRBL Sites
  • AdhereHelicopter Daylight Limit1
    • COA 11.91Restrict Helicopter Use to Daylight Hours
  • AdhereHelicopter setback from nests1
    • COA 11.79Prohibit Helicopter Line Stringing Near Occupied SWHA Nests
  • AdhereIrrigation and maintenance of replacement nest trees1
    • COA 12.5.3Irrigate and Maintain Replacement Nest Trees
  • AdhereMixed flock roost occupancy presumption1
    • COA 11.84.2Presume TRBL Occupancy for Unclearly Identified Mixed Blackbird Flocks
  • MonitorMonitoring of replacement nest trees1
    • COA 12.5.3Monitor Replacement Nest Trees for Ten Years and Beyond
  • AdhereNest tree removal avoidance1
    • COA 11.79Avoid Nest Tree Removal During SCADA and Transmission Line Work
  • AdhereNest Tree Removal Avoidance1
    • COA 11.76Avoid Removal of Known and Suitable SWHA Nest Trees
  • AdhereNesting season work restriction2
    • COA 11.70Restrict Work Near SWHA Nest Trees to Outside Nesting Season
    • COA 11.78Schedule Preconstruction Field Investigations Outside Nesting Season
  • AdhereNo contact with occupied nest trees1
    • COA 11.74Prohibit Physical Contact With Occupied SWHA Nest Trees
  • AdhereNo exiting vehicles within buffers1
    • COA 11.89Prohibit Personnel From Exiting Vehicles Inside an Occupied No-Activity Buffer
  • AdhereNo physical contact with colonies1
    • COA 11.89Prohibit Physical Contact With Active Breeding Colonies and Occupied Roost Sites
  • AdhereNo removal of occupied nest trees2
    • COA 11.76Prohibit Removal of Occupied SWHA Nest Trees Until Fledging
    • COA 11.79Prohibit Occupied Nest Tree Removal for Transmission Line Work
  • MonitorOccupancy checks of unoccupied roost sites during work1
    • COA 11.84.2Check Previously Unoccupied Roost Sites for Later TRBL Occupancy
  • AdhereOccupied nest no-activity buffer1
    • COA 11.78Keep Field Investigations 0.5 Miles From Occupied SWHA Nests
  • AdhereOccupied roost buffer4
    • COA 11.87Maintain a 300-Foot No-Activity Buffer Around an Unavoidable Occupied TRBL Roost
    • COA 11.87Modify the TRBL Roost Buffer Where Site Conditions Qualify, as CDFW Approves
    • COA 11.88Prohibit Covered Activities Within the Roosting Site
    • COA 11.90Restrict Activities Outside Delineated Habitat/Buffers
  • AdhereReplacement nest tree survival standard and replanting1
    • COA 12.5.3Meet Replacement Nest Tree Survival Standard
  • AdhereResponse to colonization adjacent to work1
    • COA 11.85Reduce Disturbance When TRBL Colonizes Habitat Adjacent to Ongoing Activities
  • AdhereSiting of replacement nest sites1
    • COA 12.5.1Site Replacement Nest Trees per Spacing Criteria
  • AdhereStop work on signs of distress3
    • COA 11.86Maintain and Adjust Protective Measures Until TRBL Behavior Normalizes
    • COA 11.86Stop Work When the Biologist Observes Colony Disruption and Agitated Behavior
    • COA 11.88Implement Additional Protective Measures When Roosting TRBL Show Agitated Behavior
Fish4
Fish rescue and salvage4
  • AdhereDead Specimen Preservation1
    • COA 11.68.3Bag, Label and Freeze a Recently Deceased GGS Carcass
  • MonitorFisheries biologist present to rescue fish during dewatering1
    • COA 11.37Station Fisheries Biologist Onsite to Rescue Fish During Dewatering
  • AdherePreservation and delivery of dead covered fish1
    • COA 11.35Preserve and Deliver Dead Covered Fish Specimens to CDFW
  • AdherePreservation and delivery of dead covered specimens1
    • COA 11.52.3Preserve and Label Tissue Sample and Carcass of Deceased CTS
Habitat protection54
Exclusion fencing and ESAs10
  • MonitorBiological monitoring during exclusion barrier installation3
    • COA 11.43Monitor Exclusion Barrier Installation and Ongoing Integrity
    • COA 11.49Monitor Exclusion Fencing Installation and Block Extending Burrows
    • COA 11.62Monitor Biologically During Barrier Installation
  • AdhereExclusion barrier construction specification2
    • COA 11.43Build Exclusion Barrier to Required Fencing Specifications
    • COA 11.62Construct the Barrier to Specification
  • AdhereExclusion fencing gate closure2
    • COA 11.43Keep Exclusion Barrier Access Gates Closed When Not in Use
    • COA 11.62Keep Access Gates Closed and Stop Work if Left Open
  • AdhereExclusion fencing in place during covered activities1
    • COA 11.43Install and Maintain High-Visibility CTS Exclusion Barrier
  • MonitorExclusion Fencing Inspection and Repair1
    • COA 9.9Inspect and Maintain Habitat Fencing, Stakes and Flags
  • AdhereExclusion fencing repair2
    • COA 11.43Repair Exclusion Barrier Defects Within 24 Hours
    • COA 11.62Maintain and Immediately Repair Barrier Defects
  • AdhereHabitat and buffer markers maintained1
    • COA 11.106Maintain Buffer Fencing Integrity Through Weather
  • MonitorInspection and reporting of habitat fencing, stakes and flags2
    • COA 11.43Monitor Exclusion Barrier Installation and Ongoing Integrity
    • COA 11.62Inspect Barrier Daily and After Rain Events
  • AdhereRefuge cover along exclusion fencing1
    • COA 11.43Provide Refuge Cover and Maintain Vegetation Along the Barrier
  • AdhereVegetation maintenance along exclusion fencing2
    • COA 11.43Provide Refuge Cover and Maintain Vegetation Along the Barrier
    • COA 11.62Maintain Low Vegetation Along the Barrier's Outer Side
Habitat avoidance and work footprint8
  • AdhereAvoidance Measures in Unmapped Habitat2
    • COA 10.7Apply Avoidance Measures to Unmapped Species Occurrences
    • COA 10.8Apply Avoidance Measures to Unmapped Suitable Habitat
  • AdhereConservation Easement Buffer1
    • COA 9.16.1Maintain 50-Foot Buffer at Bethany Complex Conservation Easements
  • AdhereGeotechnical investigation avoidance of aquatic features1
    • COA 12.2Site Geotechnical Test Locations Away From Aquatic Features
  • AdhereNo Disturbance of CDFW Conserved Lands1
    • COA 9.16Prohibit Surface Disturbance of CDFW Conserved and Managed Lands
  • AdhereSuitable habitat avoidance5
    • COA 11.65Delineate and Avoid Suitable Aquatic GGS Habitat
    • COA 11.78Delineate and Avoid SWHA Nesting Habitat at Preconstruction Sites
    • COA 11.85Avoid Suitable TRBL Nesting Habitat Within 1,300 Feet of Construction Sites
    • COA 11.87Avoid Suitable TRBL Roosting Habitat and Its 300-Foot Buffer
    • COA 11.90Restrict Activities Outside Delineated Habitat/Buffers
  • AdhereSuitable Habitat Avoidance3
    • COA 11.39Avoid Suitable CTS Habitat and Confine the Work Footprint
    • COA 11.55Avoid Suitable GGS Habitat and Confine Work to Disturbed Areas
    • COA 11.94Avoid CBB Habitat and Confine Ground Disturbance Footprint
  • AdhereWork footprint limit1
    • COA 9.8Confine Covered Activities to Delineated Construction Sites
  • AdhereWork Footprint Limit2
    • COA 11.104Confine MALI Ground Disturbance to Minimal Footprint
    • COA 11.94Avoid CBB Habitat and Confine Ground Disturbance Footprint
Habitat impact tracking2
  • MonitorGIS tracking of land disturbance and suitable habitat feature impacts1
    • COA 10.3Maintain GIS Layers Tracking Land and Habitat Feature Disturbance
  • MonitorGIS tracking of land disturbance and suitable habitat feature impacts2
    • COA 10.4Track and Map Suitable Habitat Features by Species
    • COA 10.9Track Temporary and Permanent Impacts by Project Phase
Vegetation removal14
  • MonitorBiologist presence during vegetation management3
    • COA 11.18Monitor for Fossorial Species During Vegetation Management
    • COA 11.42.2Monitor Mowing Operations for Emerging CTS
    • COA 11.57Biologist Monitors Mowing and Halts Work on GGS Detection
  • AdhereChannel bank mowing limits2
    • COA 11.57Limit Channel Bank Mowing to One Side Per Year
    • COA 11.65Limit Channel Bank Mowing and Preserve Emergent Vegetation Cover
  • AdhereEmergent vegetation left unmowed1
    • COA 11.65Limit Channel Bank Mowing and Preserve Emergent Vegetation Cover
  • AdhereEmergent Vegetation Mowing Avoidance1
    • COA 11.57Avoid Mowing Emergent Vegetation
  • AdhereHand Tool Trimming of Protected Vegetation2
    • COA 11.101Hand-Trim Protected Vegetation Only
    • COA 11.18Hand-Trim Protected Vegetation for Access Only
  • AdhereMower blade height1
    • COA 11.65Limit Channel Bank Mowing and Preserve Emergent Vegetation Cover
  • AdhereMower Blade Height3
    • COA 11.101Set Mower Blade Height to Four Inches Minimum
    • COA 11.18Set Minimum Mower Blade Heights
    • COA 11.57Maintain Vegetation Height at Minimum Six Inches When Mowing
  • AdhereMowing Timing Limit1
    • COA 11.18Time Mowing to Species Dormancy and Dry Conditions
  • AdhereMowing timing limits2
    • COA 11.42.2Mow in a Non-Concentrating Pattern During Dry Daytime Conditions
    • COA 11.57Limit Mowing to July–September Window After Clearance Survey
  • AdhereUpland Discing Prohibition3
    • COA 11.57Prohibit Discing or Tilling of Upland GGS Habitat
    • COA 11.60Prohibit Discing of Upland GGS Habitat
    • COA 11.65Limit Vegetation Control in Upland Habitat to Approved Mowing Methods
  • AdhereVegetation Removal Minimization3
    • COA 11.101Minimize Vegetation Disturbance in CBB Habitat
    • COA 11.18Minimize Vegetation Disturbance and Protect No-Disturbance Buffers
    • COA 11.57Avoid Vegetation Removal in ESAs, Burrows and Refugia
  • AdhereVegetation removal minimized1
    • COA 11.42.2Avoid Removing Vegetation Within Burrows and Refugia
  • AdhereVegetative Material Disposal3
    • COA 11.16Haul or Pile Cleared Vegetative Material Away From Habitat
    • COA 11.16Restrict Chipping and Stockpiling Over Topsoil
    • COA 11.64Dispose of Cleared Natural Debris by an Approved Method
  • AdhereWoody Vegetation Removal Window1
    • COA 11.77Time Woody Vegetation Removal to September 16–February 28
Wildlife encounters and handling14
  • AdhereCare and authorized release of covered species taken into captivity1
    • COA 11.68.2Restrict Release of Captive GGS to Quarantined, Agency-Authorized Cases
  • AdhereCare of covered species injured by covered activities1
    • COA 11.2Transport Injured Covered Species to Rehabilitation Facility
  • AdhereCare of injured covered species4
    • COA 11.52Handle and Transport Injured CTS to Rehabilitation Facility
    • COA 11.52.1Release CTS With Minor, Survivable Injury
    • COA 11.52.2Transport Seriously Injured CTS to Rehabilitation Facility
    • COA 11.81Transport Injured SWHA to Rehabilitation Facility at Permittee's Cost
  • AdhereCare of Injured Covered Species3
    • COA 11.68Transport Injured GGS to a CDFW-Approved Rehabilitation Facility
    • COA 11.68.1Release GGS With Minor, Survivable Injury Per Relocation Plan
    • COA 11.68.2Transport Seriously Injured GGS to Nearest Rehabilitation Facility
  • AdhereCovered species capture and handling1
    • COA 11.50Capture, Handle, and Transport CTS Under CDFW Protocols
  • AdhereCovered Species Capture and Handling3
    • COA 11.3Capture and Handle Covered Species per Hygiene Protocol
    • COA 11.67.1Capture and Handle GGS Only Through the Designated Biologist
    • COA 11.80Restrict SWHA Capture and Handling to Qualified Designated Biologist
  • NotifyCovered Species Encounter Reporting to the Biologist1
    • COA 11.1Report Covered Species Encounters and Halt Work
  • AdhereCovered species relocation1
    • COA 11.51.1Relocate Threatened CTS Under Numbered Placement Parameters
  • AdhereCovered Species Relocation2
    • COA 11.1Relocate Trapped or Injured Covered Species from Construction Site
    • COA 11.67.1Relocate GGS Only When Directly Threatened and Unable to Self-Escape
  • AdhereInjured Wildlife Rehabilitation Transport1
    • COA 11.93Transport Injured TRBL to Approved Care Facility
  • MonitorMonitoring record of covered species capture and relocation1
    • COA 11.3Maintain Capture and Relocation Monitoring Records
  • AdhereWildlife encounter response3
    • COA 11.14Divert Activities When Wildlife Found in Excavations
    • COA 11.14Relocate Wildlife Found in Excavations
    • COA 11.39Notify Designated Biologist of CTS Encounters
  • AdhereWildlife Encounter Response4
    • COA 11.55Stop Work and Relocate GGS Unearthed During Ground Disturbance
    • COA 11.55.1Allow or Relocate GGS Found on a Roadway
    • COA 11.65Respond to GGS Encountered at the Work Site
    • COA 11.67.1Capture and Handle GGS Only Through the Designated Biologist
  • AdhereWork Stoppage on Covered Species Encounter1
    • COA 11.1Report Covered Species Encounters and Halt Work
Wildlife entrapment6
  • MonitorBiologist inspection and presence when excavations are filled or covered1
    • COA 11.14Inspect Excavations Before Filling for Trapped Animals
  • AdhereDebris Pile Removal1
    • COA 11.15Minimize and Regularly Remove Debris Piles After Inspection
  • MonitorInspection of stored pipes, culverts and similar structures for wildlife1
    • COA 11.15Inspect Stored Pipes and Culverts for Wildlife
  • MonitorMorning inspection of overnight equipment, materials and excavations for trapped wildlife1
    • COA 11.14Inspect Overnight Equipment and Excavations Each Morning
  • MonitorWildlife check of idle vehicles and equipment before moving1
    • COA 9.12Inspect Idle Vehicles and Equipment for Wildlife Before Moving
  • AdhereWildlife in stored materials response1
    • COA 11.15Respond to Wildlife Found in Stored Pipes or Debris
Hazards26
Fire prevention3
  • AdhereFire Suppression Supplies On Site1
    • COA 9.18Keep Basic Fire Suppression Supplies On Site at Bethany Complex
  • AdhereVegetation clearing method for fire prevention1
    • COA 9.18Hand Clear Vegetation for Fire Prevention, Timed to Surveys and Exclusion Barriers
  • AdhereVegetation Clearing Method for Fire Prevention1
    • COA 9.18Clear Non-Living Vegetative Debris from the Work Footprint
Hazardous materials8
  • AdhereConcrete Washwater Containment2
    • COA 11.22Contain Concrete and Wash Water in Watertight Structures
    • COA 11.26Contain Concrete and Wash Water to Protect Surface Waters
  • AdhereContaminated Soil Segregation and Removal1
    • COA 11.21Segregate, Contain, and Remove Contaminated Soils
  • MonitorDatabase of historic contamination and hazardous materials inspections1
    • COA 11.21Maintain Historic Contamination and Inspection Database
  • AdhereHazardous Materials Container Labeling1
    • COA 11.21Label Hazardous Material Containers
  • AdhereHazardous Materials in Designated Storage1
    • COA 11.21Designate Storage Sites for Fuel, Oil, and Petroleum Products
  • AdhereHazardous Materials Storage Duration Limit1
    • COA 11.21Limit Temporary Hazardous Materials Storage to 90 Days
  • AdhereMaterial Safety Data Sheets provided to site personnel1
    • COA 11.21Provide Material Safety Data Sheets to Site Personnel
  • AdherePetroleum Storage Containment1
    • COA 11.22Store Petroleum Products at Impervious Storage Sites
Pesticides and rodenticides4
  • RosterLicensed Pesticide Applicator2
    • COA 11.4Apply Sprays via Licensed Applicator Within Wind Speed Limit
    • COA 11.4Keep Herbicide and Pesticide Application 300 Feet from Aquatic Habitat
  • AdherePesticide Application Wind Limit1
    • COA 11.4Apply Sprays via Licensed Applicator Within Wind Speed Limit
  • AdherePesticide Setback from Aquatic Habitat1
    • COA 11.4Keep Herbicide and Pesticide Application 300 Feet from Aquatic Habitat
  • AdhereRodenticide and Poison Prohibition1
    • COA 11.5Prohibit Rodenticide, Poison, and Broadcast Baiting Use
Refueling and equipment servicing5
  • MonitorDaily contaminant leak check and maintenance of vehicles and equipment1
    • COA 9.13Daily Inspect and Maintain Vehicles to Prevent Contaminant Release
  • MonitorDaily inspection of equipment in contact with water for petroleum leaks1
    • COA 11.22Inspect Water-Contact Equipment Daily for Petroleum Leaks
  • AdhereFuel Transfer Containment1
    • COA 11.22Use Spill Containment Materials Under Fuel Transfer Areas
  • AdhereRefueling Practices1
    • COA 9.13Contain and Attend Vehicle Refueling Operations
  • AdhereRefueling Setback from Water1
    • COA 9.13Keep Refueling, Maintenance and Fuel Storage 200 Feet from Water
Spill prevention and response6
  • AdhereEquipment Cleaning Before Water Contact1
    • COA 11.22Clean Petroleum Products Off Equipment Before Water Contact
  • AdhereOil Absorbent Booms in Place1
    • COA 11.22Use Oil-Absorbent Booms Near Water
  • AdhereSpill Containment and Response1
    • COA 11.22Contain the Source of an Accidental Spill
  • AdhereSpill Kits On Site2
    • COA 11.21Stage Spill Containment and Kits at Every Work Site
    • COA 11.22Maintain Spill Containment Materials in Sealed Containers
  • AdhereSpill Response1
    • COA 9.14Immediately Stop and Clean Up Fuel and Hazardous Waste Spills
  • AdhereStaging Area Spill Containment1
    • COA 11.22Design Staging Areas to Prevent Spill Drainage to Waters
Lighting4
Lighting near habitat and waters4
  • MonitorAccess road location assessment before visual barrier installation1
    • COA 11.10Assess Access Road Locations Before Visual Barrier Installation
  • AdhereIntake Lighting Restricted from the River Channel2
    • COA 11.9Position Temporary Construction Lighting to Avoid the River Channel
    • COA 11.9Prohibit Permanent Intake Lighting Toward the Sacramento River
  • AdhereLighting Color Near Habitat1
    • COA 11.8Use Yellow or Orange Lighting Near Covered Species Habitat
  • AdhereNight Lighting Spill Control2
    • COA 11.47Restrict Night-Work Lighting to Worker Safety Uses
    • COA 11.8Shield and Limit Nighttime Lighting Spill Toward Habitat
Mitigation and restoration20
Mitigation funding2
  • AdhereFunding of interim management of Habitat Management lands1
    • COA 12.11.7Fund Interim Management from SWP Contractor Charges
  • AdhereHolding, pooling and disbursement of the Endowment3
    • COA 12.12.4Hold and Pool Endowment with Separate Accounting
    • COA 12.12.4Process CDFW-Directed Endowment Expenditures
    • COA 12.12.4Require CDFW Approval Before Principal Disbursement
Mitigation lands8
  • AdhereCompensatory habitat acreage for each covered species1
    • COA 12Meet Compensatory Mitigation Acreage via Credits or HM Lands
  • AdhereFee title to Habitat Management lands1
    • COA 12.11.1Transfer Fee Title of HM Lands to CDFW
  • AdhereHabitat Management lands stay-ahead ratio1
    • COA 12Maintain 10% HM Lands Stay-Ahead Ratio
  • AdhereIntegration of the spawning habitat study into shallow spawning habitat design1
    • COA 12.6.1Integrate Spawning Habitat Study into Design
  • AdhereInterim management of Habitat Management lands1
    • COA 12.11.7Implement Interim Management of HM Lands
  • MonitorLong-term monitoring of tidal habitat mitigation sites1
    • COA 12.6.1Monitor Habitat Mitigation Sites for Ten Years
  • NotifyOngoing demonstration of mitigation performance during the permit term1
    • COA 13.3Provide Ongoing Demonstration of Mitigation Performance
  • AdherePerpetual management, maintenance and monitoring of Habitat Management lands1
    • COA 12.12Implement Perpetual Management of HM Lands
Restoration10
  • AdhereErosion protection of restoration soils until vegetation establishes1
    • COA 12.3.3Protect Restoration Soils and Meet Seeding Window
  • AdhereInvasive plant management and cover limit at restoration sites1
    • COA 12.3.3Control Invasive Plants at Restoration Sites
  • MonitorMonitoring and maintenance of habitat restoration areas1
    • COA 12.3.4Monitor and Maintain Restoration Areas to Success
  • MonitorMonitoring of restored habitat until success1
    • COA 11.66Monitor Restored GGS Habitat Until Restoration Success
  • AdhereRestoration survivorship and cover success standards with remedial action2
    • COA 12.3.3Meet Restoration Survivorship Success Standards
    • COA 12.3.4Perform Remedial Restoration When Standards Are Unmet
  • AdhereSeed mix composition and sourcing for restoration1
    • COA 12.3.3Design Seed Mix and Target Vegetation Communities
  • AdhereSeeding timing and reseeding at restoration sites1
    • COA 12.3.3Protect Restoration Soils and Meet Seeding Window
  • AdhereSubstrate removal, topsoil salvage and imported fill in restoration areas1
    • COA 12.3.3Remove Invasive Substrate and Manage Restoration Fill
  • AdhereTarget native vegetation community for each restoration area1
    • COA 12.3.3Design Seed Mix and Target Vegetation Communities
  • AdhereVehicle Barriers on Restored Shoulders1
    • COA 12.3.3Install Barriers to Protect Restored Road Shoulders
Noise and vibration12
Pile driving and underwater sound12
  • MonitorContinual hydroacoustic monitoring of in-water work1
    • COA 11.33Conduct Two-Hydrophone Hydroacoustic Monitoring Per Site
  • AdhereEscape route during multiple pile driver operation1
    • COA 11.33Provide Fish Escape Route for Multiple Pile Driving Rigs
  • AdhereHours of the day for pile driving1
    • COA 11.33Coordinate CDFW/NMFS/USFWS Time-of-Day Pile Driving Restriction
  • AdhereImpact pile driving limits1
    • COA 11.31.2Cap Impact Pile Driving Within Table 4–6 Limits
  • AdherePile Driving Hour Limit1
    • COA 11.32Restrict Pile Driving to 7 AM–7 PM
  • AdherePile driving noise attenuation1
    • COA 11.33Deploy Noise-Attenuation Equipment for Impact Pile Driving
  • AdherePile driving soft start1
    • COA 11.33Apply Soft-Start Sequence to Impact Pile Driving
  • AdhereShoulder-season pile driving restrictions1
    • COA 11.31.2Permit Shoulder-Season Pile Driving With Noise Attenuation
  • AdhereUnderwater noise disturbance threshold outside the construction work window1
    • COA 11.31.2Verify Sound Below 150 dB Outside the Work Window
  • AdhereUnderwater noise threshold outside the work window1
    • COA 11.33Maintain Disturbance Threshold Outside the Work Window
  • AdhereUnderwater noise threshold within the work window1
    • COA 11.33Maintain Injury Thresholds During the Construction Work Window
  • MonitorWatch for distressed or injured fish during pile driving1
    • COA 11.33Monitor Work Area for Distressed or Injured Fish
People and qualifications7
Designated biologists and monitors6
  • RosterApproved Wildlife Handler1
    • COA 11.92Restrict TRBL Handling to CDFW-Approved Biologist
  • RosterBiological Monitor qualifications and permitted scope1
    • COA 9.2.2Maintain Qualified Biological Monitor Scope of Work
  • MonitorBiologist or monitor on site during take-risk construction activities4
    • COA 11.104Monitor Covered Activities in Suitable MALI Habitat
    • COA 11.104Station Biologist Onsite Daily During Initial Ground Disturbance
    • COA 11.106Station Biologist Onsite During Buffer Installation
    • COA 9.2Maintain Biological Monitor Presence During Construction
  • RosterDesignated Biologist and Fisheries Biologist qualifications and responsibilities1
    • COA 9.2.1Maintain Qualified Designated/Fisheries Biologist Credentials
  • RosterHandling and relocation restricted to the approved Designated Biologist1
    • COA 11.108Collect, Handle and Relocate Threatened MALI Plants
  • AdhereStop-work authority of biologists and monitors1
    • COA 9.3Exercise Stop-Work Authority for Non-Compliant Activity
Qualified specialists1
  • RosterPermitted personnel for studies that may take Covered Fish Species1
    • COA 10.22Ensure Permitted Personnel Conduct Covered Species Studies
Plants and invertebrates16
Bumble bees and monarchs11
  • AdhereActive nest buffer2
    • COA 11.102Halt Work Within 50-Foot CBB Nest Buffer
    • COA 11.98Enforce No-Activity Buffer Around Discovered CBB Nest
  • MonitorDaily visual sweeps for bee flight activity during work1
    • COA 11.99Conduct Daily Visual Sweeps for CBB Flight Activity
  • AdhereFlowering Vegetation Removal Timing1
    • COA 11.95Time Flowering Vegetation Removal Outside Colony Active Period
  • MonitorInspection and supervision of refugia removal during overwintering1
    • COA 11.95Inspect and Supervise Overwintering Refugia Removal
  • MonitorMonitoring of a relocated nest1
    • COA 11.102Monitor Relocated CBB Nest for One Week
  • AdhereOverwintering Habitat Disturbance Avoidance1
    • COA 11.95Avoid Ground Disturbance During Overwintering Period
  • AdhereRelocation as a last resort under the approved protocol1
    • COA 11.108Collect, Handle and Relocate Threatened MALI Plants
  • MonitorSearch for the active nest when a bee is detected on site1
    • COA 11.99Search for Active Nest After a CBB Detection
  • AdhereStop work on covered species discovery2
    • COA 11.104Stop Work Pending MALI Translocation Upon Discovery
    • COA 11.94Halt Activities Within 50 ft of a Discovered CBB Nest
  • AdhereUnderground refugia buffer1
    • COA 11.100Avoid and Buffer Underground CBB Refugia
  • AdhereVegetation removal clearance near refugia1
    • COA 11.100Hold Refugia Vegetation Removal Until Overwintering Absence Confirmed
Special-status plants5
  • AdhereAvoidance of covered plant removal1
    • COA 11.106Follow MALI Relocation Plan When Removal Is Unavoidable
  • AdhereCovered Plant Removal Avoidance1
    • COA 11.106Avoid MALI Removal to Maximum Extent Practicable
  • AdhereLevee Landside Line Maintenance1
    • COA 11.107Site SCADA/Transmission Line Maintenance on Levee Landside
  • AdherePost-disturbance grading to elevations and hydrology suitable for covered plants1
    • COA 12.3.3Design Seed Mix and Target Vegetation Communities
  • AdhereSpecial-status plant occurrence buffer2
    • COA 11.106Establish 100-Foot No-Activity Buffer Around MALI
    • COA 11.107Place Non-Disturbance Buffers Around MALI Before Maintenance
Site conduct30
Access routes and parking5
  • AdhereEquipment Confined to Access Routes2
    • COA 11.55.1Confine Project Vehicles to Existing Routes
    • COA 11.69Confine Project Access and Vehicle Traffic to Existing Routes
  • AdhereEquipment confined to designated access routes2
    • COA 11.41Confine Heavy Equipment to Approved Access Routes
    • COA 11.65Confine Equipment Movement and Limit Vehicle Speed in Upland Habitat
  • AdhereEquipment Storage Setback from Aquatic Habitat1
    • COA 9.11Store Equipment and Vehicles 200 Feet from Aquatic Habitat
  • AdhereStaging Area Confinement1
    • COA 9.11Confine Staging and Laydown to Disturbed Areas Within the Site
  • AdhereUse of Established Access Routes2
    • COA 9.10Confine Site Access and Vehicle Travel to Established Routes
    • COA 9.11Confine Activity to the Marked Site, Avoiding Covered Species Habitat
Agency and biologist access6
  • AdhereAgency access to construction sites1
    • COA 11.35Provide CDFW Site Access During Fish Salvage Activities
  • AdhereCDFW access to the Project and mitigation lands1
    • COA 9.15Provide CDFW Access to Project and Mitigation Lands
  • AdhereConstruction-monitoring documentation kept on site1
    • COA 9.5Maintain On-Site Construction Monitoring Documentation
  • AdhereNo agreements restricting contractor or biologist communication with CDFW1
    • COA 9.3Prohibit Contracts That Restrict CDFW Communication
  • AdhereUnfettered biologist access to the Project Site1
    • COA 9.3Provide Unfettered Biologist Access to the Project Site
  • AdhereWallet card or fact sheet carried by workers in the Project Area1
    • COA 9.4Distribute Wallet Cards or Fact Sheets to All Workers
Compliance inspections and records2
  • MonitorDaily biologist compliance inspection at each construction site and maintenance activity1
    • COA 10.10Conduct Daily Compliance Inspections at Each Site
  • MonitorDaily written observation and inspection record1
    • COA 10.10Prepare Daily Written Inspection Records
Facility design and siting4
  • MonitorAnnual inspection and replacement of bird strike diverters1
    • COA 11.17.1Inspect and Replace Bird Strike Diverters Annually
  • AdhereBird Strike Diverter Maintenance1
    • COA 12.4Maintain Installed Bird Strike Diverters
  • AdherePower line and support structure siting away from covered species habitat2
    • COA 11.17Site Power Lines and Structures to Avoid Covered Species Habitat
    • COA 11.79Site Poles and Lines Outside Suitable SWHA Nesting Habitat
  • AdhereRoadway design passable by covered species1
    • COA 11.12Design Wildlife-Passable Roadway Curbs and Barriers
Pets, firearms and campfires1
  • AdhereNo Pets, Campfires or Firearms On Site1
    • COA 11.20Prohibit Pets, Campfires, and Firearms at Construction Sites
Speed limits6
  • AdhereNighttime Speed Limit1
    • COA 11.11Enforce Nighttime 10 MPH Limit at Bethany Complex
  • AdherePaved Road Speed Limit1
    • COA 11.11Enforce Project Vehicle Speed Limits on Access Roads
  • AdhereSpeed Limit Near Habitat3
    • COA 11.11Limit Speed Near GGS Habitat During Active Season
    • COA 11.39.1Observe 10 MPH Speed Limits in CTS Habitat and Near Burrows
    • COA 11.55.1Observe Vehicle Speed Limits in GGS Upland Habitat
  • AdhereSpeed Limit Posting1
    • COA 11.11Post Speed Limit and Wildlife Crossing Signage
  • AdhereUnpaved Road Speed Limit2
    • COA 11.11Enforce Project Vehicle Speed Limits on Access Roads
    • COA 11.29Limit Vehicle Speed on Unpaved Roads to 10 MPH
  • AdhereWildlife Crossing Signage1
    • COA 11.11Post Speed Limit and Wildlife Crossing Signage
Trash and food waste4
  • AdhereCovered Food Waste Containers1
    • COA 11.20Store Food-Related Trash in Enclosed Containers
  • AdhereTrash Abatement1
    • COA 9.6Maintain Trash Abatement Program with Animal-Proof Containers
  • AdhereTrash Load Covering1
    • COA 11.20Cover and Secure Loads on Trash-Hauling Vehicles
  • AdhereTrash Removal Cadence1
    • COA 11.20Remove Trash from Site Weekly
Work hours2
  • AdhereDaytime Work Hour Limit2
    • COA 11.46Restrict Covered Activities to Daylight Hours in CTS Active Season
    • COA 11.7Restrict Covered Activities to Daylight Hours
  • AdhereNight Vehicle Travel Caution1
    • COA 11.7Exercise Caution for Nighttime Vehicle Travel After Construction
Water43
Barge and vessel operations7
  • AdhereBarge Mooring and Anchoring1
    • COA 11.36Operate Vessels per Barge Operations BMPs
  • MonitorBiological monitoring of barge operations1
    • COA 11.36Monitor Barge Loading, Unloading and Geotechnical Activities
  • AdherePropeller Wash Limit1
    • COA 11.36Operate Vessels per Barge Operations BMPs
  • AdhereVessel Deck Loose Material Containment1
    • COA 11.36Operate Vessels per Barge Operations BMPs
  • AdhereVessel Navigation Regulation Compliance1
    • COA 11.36Operate Vessels per Barge Operations BMPs
  • AdhereVessel Speed and Wake Limit1
    • COA 11.36Operate Vessels per Barge Operations BMPs
  • AdhereVessel Spill Kits Onboard1
    • COA 11.36Operate Vessels per Barge Operations BMPs
Dewatering5
  • MonitorBiologist present to salvage snakes during dewatering1
    • COA 11.61Station Biologist to Salvage GGS During Dewatering
  • AdhereDewatering Pump Intake Screening1
    • COA 11.37Screen Dewatering Pump Intakes to Prevent Fish Entrainment
  • AdhereDewatering pump shutdown1
    • COA 11.61Shut Down Pump and Contact Biologist if GGS Seen at Intake Screen
  • AdhereDewatering rate limit1
    • COA 11.37Halt Dewatering When Water Levels Drop Too Quickly for Salvage
  • AdhereDewatering Window1
    • COA 11.61Limit Dewatering to the April 15–October 1 Window
Erosion and sediment control20
  • AdhereDamaged Pavement Repaving1
    • COA 11.26Repave Construction-Damaged Pavement to Prevent Erosion
  • AdhereEmergency Erosion Control Supplies On Site1
    • COA 11.26Maintain Emergency Erosion Control Supplies
  • AdhereErosion Control in Place Before Storms1
    • COA 11.13Initiate Erosion Control Measures Before Storm Events
  • MonitorErosion control inspection before, during and after storms1
    • COA 9.7Monitor Construction Sites Before, During and After Storm Events
  • AdhereErosion Control Material Standard1
    • COA 11.27Use Approved Erosion Control Material Composition and Installation
  • AdhereGround Disturbance Minimization5
    • COA 11.26Limit Ground Disturbance to Stable Areas
    • COA 11.26Minimize Disturbance of Terrain and Natural Land Features
    • COA 11.26Sequence Clearing to Minimize Soil Disturbance Time
    • COA 11.48Confine Clearance Work to Minimal Disturbance Area
    • COA 11.63Confine Clearance Work to Minimal Disturbance Footprint
  • AdhereGrubbed Material Disposal1
    • COA 11.16Backfill or Remove Grubbed Rock and Inorganic Material
  • MonitorInspection of erosion controls before, during and after rain events2
    • COA 11.26Inspect Erosion Controls and Schedule Around Rain Events
    • COA 11.27Monitor and Repair Erosion Controls Around Rain Events
  • MonitorMonitoring of the 72-hour weather forecast for each project site4
    • COA 11.13Monitor 72-Hour Weather Forecast for Each Project Site
    • COA 11.27Consult 72-Hour Weather Forecasts Before Sediment-Risk Activities
    • COA 11.45Monitor NWS 72-Hour Rain Forecast Before Site Work
    • COA 11.58.1Monitor 72-Hour Forecast and Observe Post-Rain Dry-Out Period
  • AdhereMonofilament Netting Prohibition4
    • COA 11.27Prohibit Monofilament and Synthetic Netting for Erosion Control
    • COA 11.28Prohibit Monofilament Netting Site-Wide
    • COA 11.43Prohibit Plastic Monofilament Netting in the Exclusion Barrier
    • COA 11.62Prohibit Plastic Monofilament Netting in the Exclusion Barrier
  • AdherePrecipitation Work Limit1
    • COA 11.58.1Restrict Work Period to Low Rainfall and Dry Weather
  • AdhereRunoff and Drainage Control3
    • COA 11.26Divert Runoff Away from Steep or Denuded Slopes
    • COA 11.26Install Runoff and Drainage Control Features
    • COA 11.26Replace or Upgrade Drainage Facilities to Minimize Erosion
  • AdhereSediment Control Measures1
    • COA 11.26Control On-Site Sediment Transport and Turbidity
  • AdhereSizing, siting and protection of spoils and RTM storage sites1
    • COA 11.16Size and Site Spoils and RTM Storage Areas
  • AdhereSpoils Storage Site Siting1
    • COA 11.16Restrict Storage Site Placement Near Habitat and Watercourses
  • AdhereStockpile Placement and Covering1
    • COA 11.26Cover Stockpiled Excavated Materials Away from Drainage Courses
  • AdhereStorm Onset Work Restriction1
    • COA 9.7Restrict Sediment-Generating Work Ahead of Storm Onset
  • AdhereVegetation Retention for Erosion Control1
    • COA 11.26Retain Trees and Vegetation to Stabilize Hillsides
  • AdhereWind Erosion Control1
    • COA 11.26Install Wind Erosion Control Features
  • AdhereWork limits during precipitation2
    • COA 11.13Restrict Work Near Waters During Rain and Wet Weather
    • COA 11.45Cease Construction on 30% Rain Forecast Near CTS Breeding Sites
In-water work3
  • AdhereDaily In-Water Work Limit2
    • COA 11.31.1Enforce Daily Sunset-to-Sunrise In-Water Work Curfew
    • COA 11.32Enforce Daily Sunset-to-Sunrise In-Water Work Curfew
  • AdhereIn-Water Work Window During Construction1
    • COA 11.31.2Restrict In-Water Construction to June 1–Oct 31 Window
  • AdhereIn-Water Work Window During Pre-Construction1
    • COA 11.31.1Restrict Geotechnical Exploration to Aug 1–Oct 31 Window
Invasive species6
  • AdhereInvasive Animal Removal1
    • COA 11.19Permanently Remove Bullfrogs Encountered During Work
  • AdhereInvasive plant removal methods in restoration areas1
    • COA 11.19.2Oversee Invasive Plant Removal During Restoration
  • MonitorInvasive species inspection of in-water equipment before deployment1
    • COA 11.36Inspect In-Water Equipment for Invasive Species Before Deployment
  • AdhereInvasive Species Spread Prevention1
    • COA 11.19Prevent Introduction and Spread of Invasive Species Between Sites
  • AdherePathogen Spread Prevention BMPs1
    • COA 11.19Implement BMPs to Prevent Phytophthora and Mold Spread
  • AdherePredatory Species Introduction Prohibition1
    • COA 11.53Prohibit Introduction of Predatory Fish and Amphibians Near CTS Habitat
Stormwater and discharges2
  • AdhereNon-Stormwater Discharge Prevention1
    • COA 11.25Prevent Non-Stormwater Discharges to Surface Waters
  • AdhereReusable Tunnel Material Drainage Discharge1
    • COA 11.16Prevent Erosion and Toxicity from RTM Drainage Discharge
Water operations35
Biological performance criteria5
  • AdhereBiological criterion on entrainment, survival and abundance reduction3
    • COA 11.115.1Assess Covered Activities Against Smelt Entrainment and Abundance Criteria
    • COA 11.116.1Assess Covered Activities Against Salmonid Survival Criterion
    • COA 11.117.1Assess Covered Activities Against Sturgeon Catch Criterion
  • AdhereBiological criterion on population growth rate3
    • COA 11.115.2Assess Smelt Population Growth Rate Against Baseline
    • COA 11.116.2Assess Salmonid Population Growth Rate Against Baseline
    • COA 11.117.2Assess Sturgeon Population Growth Rate Against Baseline
  • AdhereCovered Fish Species Biological Criteria met during operations1
    • COA 10.21.8Ensure Operations Meet Covered Fish Species Biological Criteria
  • MonitorFunding and data support for Covered Fish Species life cycle models1
    • COA 10.21.2Fund and Support Covered Fish Species Life Cycle Models
  • AdhereNo entrainment of juvenile salmon at the north Delta intakes1
    • COA 11.116.1Monitor for Juvenile Salmon Entrainment at North Delta Intakes
Diversion limits and bypass flows16
  • AdhereAdditional Suisun Marsh Salinity Control Gate operating days for Delta smelt habitat1
    • COA 12.6.3Operate SMSCG Additional Days for DS Summer-Fall Habitat
  • AdhereAnnual Operating Criteria Schedule6
    • COA 11.111.2Apply Default December Through May Operating Criteria
    • COA 11.111.2Apply Default June Operating Criteria Before Salmon Presence Off-Ramp
    • COA 11.111.2Apply July Risk-Based Diversion Criteria
    • COA 11.111.2Apply June Operations Criteria After Salmon Presence Off-Ramp
    • COA 11.111.2Apply November Risk-Based Diversion Criteria
    • COA 11.111.2Implement Year-Round Diversion Conditions of Approval
  • AdhereAnnual schedule for applying the diversion operating criteria1
    • COA 11.111.2Coordinate Project Operations With CDFW During Phase 1 and 2
  • AdhereBypass Flow Minimum4
    • COA 11.111Maintain Minimum Bypass Flow Below Intake C (Tidally Dominated)
    • COA 11.111.2Maintain Mandatory Bypass Flow November 1 Through July 30
    • COA 11.111.2Maintain Minimum Bypass Flow August 1 Through September 30
    • COA 11.111.2Maintain Minimum Bypass Flow October 1 Through October 31
  • AdhereCombined south and north Delta SWP diversion daily cap2
    • COA 11.112Cap Combined South and North Delta SWP Diversions
    • COA 11.114Cap Combined South and North Delta SWP Diversions
  • AdhereDiversion Flow Fraction Limit3
    • COA 11.111Cap Diversion at 10-12% of Flow, Flow Dominated
    • COA 11.111Cap Diversion at 6% of Flow, Tidally Dominated
    • COA 11.111Cap Diversion at 6-10% of Flow, Transitional
  • AdhereFlow Reversal Minimization1
    • COA 10.21.7Manage Diversions to Minimize Sacramento River Flow Reversals
  • AdhereJune Diversion Limit2
    • COA 11.111.1Apply Post-15-Day High-Bypass June Diversion Limits
    • COA 11.111.1Apply Tiered June Diversion Limits by Freeport Flow
  • AdhereLarval Distribution Operational Scenario1
    • COA 12.6.5Implement Approved Operational Scenario During Operations
  • AdhereLimits on shifting exports from south Delta to north Delta during balanced conditions1
    • COA 11.113Limit Export Shifting to North Delta During Balanced Conditions
  • AdhereNo additional upstream stored water releases for north Delta diversion1
    • COA 11.112Restrict Additional Upstream Reservoir Releases for Diversion
  • AdhereNo Diversion When the Delta Cross Channel Gates Are Open1
    • COA 11.111Prohibit Diversion While Delta Cross Channel Gates Are Open
  • AdhereNo north Delta diversion during balanced conditions at low south Delta exports1
    • COA 11.113Prohibit North Delta Diversions During Low-Export Balanced Conditions
  • AdherePhase 1 Operations Limit3
    • COA 11.110Cap Diversion at 500 CFS During Phase 1 Testing
    • COA 11.110Cap Phase 1 Operations at One Calendar Year
    • COA 11.110Prohibit Diversion During Bethany Reservoir Contractor's Test
  • AdherePhase 2 Operations Limit1
    • COA 11.110Cap Phase 2 Operations at One Calendar Year
  • AdhereSalmon presence off-ramp from spring operating criteria1
    • COA 11.111.6Determine Salmon Passage and Temperature Trigger for June Shift
Fish screens5
  • AdhereApproach Velocity Maintenance1
    • COA 10.27.2Maintain Approach Velocity Within Screening Criteria
  • AdhereDiversion Spreading Across Screens1
    • COA 11.109Spread Diversion Across Intakes to Minimize Localized Velocity
  • AdhereFish Screen Velocity Criteria2
    • COA 11.109Divert Only Within Fish Screen Approach Velocity Limit
    • COA 11.109Maintain Minimum Fish Screen Sweeping Velocity
  • AdhereUnscreened Diversion Prohibition1
    • COA 11.109.1Prohibit Diversion Through Non-Functional Screen Units
  • MonitorVisual inspection of intake fish screens for integrity, cleaning and impingement1
    • COA 10.28Visually Inspect Fish Screens Several Times per Year
Operations coordination and data5
  • AdhereNorth Delta Diversion Monitoring Team membership and meeting cadence1
    • COA 11.111.3Begin Risk Assessments Last Week of October and Meet Weekly Through November
  • AdhereNorth Delta Diversion Monitoring Team membership and meeting cadence2
    • COA 11.111.3Establish NDDMT Membership With CDFW and Optional Federal Partners
    • COA 11.111.5Convene NDDMT to Review Real-time Operations Data
  • AdhereNorth Delta Diversion Monitoring Team membership and meeting cadence3
    • COA 11.111.3Convene NDDMT As Needed December Through June
    • COA 11.111.3Convene NDDMT Weekly Beginning First Week of October
    • COA 11.111.3Convene NDDMT Weekly in July
  • AdhereResolution and implementation of real-time operations decisions1
    • COA 11.111.5Resolve Disputed Real-time Operations Decisions
  • MonitorWeekly operations risk assessment content2
    • COA 11.111.3Begin Risk Assessments Last Week of October and Meet Weekly Through November
    • COA 11.111.3Conduct Risk Assessments Covering Components A Through G
Operations monitoring and studies4
  • MonitorAssessment of juvenile salmon route entrainment by reach and junction1
    • COA 10.21.7Assess Juvenile Salmon Route Entrainment by Reach and Junction
  • MonitorCovered fish monitoring across baseline, construction and operations periods1
    • COA 10.18.2Evaluate Fish Monitoring Results Against Biological Criteria
  • MonitorFood web and larval fish entrainment study1
    • COA 10.21.3Incorporate Food Web and Entrainment Results into Life Cycle Models
  • MonitorModeling of operations effects on Delta smelt habitat in Suisun Marsh and Grizzly Bay1
    • COA 12.6.3Model Operations Effects on DS Habitat in Suisun Marsh