Analysis13
  • Calculate Phase Impacts and Mitigation for Authorization Package
  • Complete COA 10.25 Series Models and Report
  • Complete Hydraulic and Sediment Transport Modeling Report
  • Complete Joint Operations Optimization Study
  • Complete Sacramento River Hydrograph Limb Impact Evaluation
  • Complete WS Life Cycle Model Re-Evaluation Report
  • Develop CDFW-Approved Spring LFS Operational Scenario
  • Develop Real-Time Biological Criteria Compliance Model
  • Develop Tidal Wetland Restoration Efficacy Study Plan
  • Prepare Endowment Assessment for CDFW Approval
  • Prepare Phase Security Cost Estimate for HM Lands
  • Prepare Weekly Operating-Criteria Risk Assessment Report
  • Submit Fish Guidance System Recommendation Report to CDFW
Approval & Consultation49
  • Consult CDFW on Deceased CTS Specimen Disposal
  • Consult CDFW on Federal Biological Opinions
  • Consult CDFW on Non-Native or Hybrid Salamander Measures
  • Convene Fish Guidance System Working Group
  • Coordinate Annual Selection of CHNWR and CHNSR Funded Projects
  • Coordinate with CDFW on Breeding Habitat Buffer Encroachment
  • Coordinate with CDFW on Mitigation Site Selection and Design
  • Designate CDFW-Approved Interim and Long-Term Land Managers
  • Notify and Consult CDFW on ITP Amendment Conditions
  • Obtain CDFW Approval for In-Channel Work in the GGS Active Season
  • Obtain CDFW Approval for Pesticide and Herbicide Use
  • Obtain CDFW Approval of a Reduced SWHA Nest Buffer
  • Obtain CDFW Approval of a Substitute Biologist or Monitor
  • Obtain CDFW Approval of Biological Criteria Compliance Models
  • Obtain CDFW Approval of Dewatering Measure Deviations
  • Obtain CDFW Approval of Erosion Control Stabilization Measures
  • Obtain CDFW Approval of HM Lands Before Acquisition
  • Obtain CDFW Approval of Mitigation Habitat Restoration Projects
  • Obtain CDFW Approval of Mowing or Clearing Equipment
  • Obtain CDFW Approval of Nighttime Covered Activities
  • Obtain CDFW Approval of the Endowment Management Agreement
  • Obtain CDFW Approval of the HM Lands Conservation Easement
  • Obtain CDFW Approval of the Mitigation or Conservation Bank
  • Obtain CDFW Approval to Construct Off-Site Travel Routes
  • Obtain CDFW Approval to Extend Phase 1 Operations
  • Obtain CDFW Approval to Remove or Trim a Known Nest Tree
  • Obtain CDFW Approval to Work During the SWHA Nesting Season
  • Obtain CDFW Approval to Work Outside the Seasonal Window
  • Obtain CDFW Permission for Hazardous Material Use Near Streams
  • Obtain CESA Authorization for HM Lands Activities
  • Submit Annual Biologist Reapproval List to CDFW
  • Submit Biologist Resume Forms to CDFW Before Each Phase
  • Submit Buffer Zone Designs and Locations for CDFW Approval
  • Submit Construction Phase Authorization Package to CDFW
  • Submit Culvert Under-Crossing Count and Location Report
  • Submit Endowment Assessment for CDFW Approval
  • Submit Endowment Manager Proposal to CDFW
  • Submit Exclusion Barrier Design and Locations to CDFW
  • Submit Fertilizer Application Plan for CDFW Approval
  • Submit Fish Study Plans and Reports for CDFW Approval
  • Submit Habitat Disturbance Footprint and ESAs for CDFW Approval
  • Submit Hazardous Materials Management Plan to CDFW
  • Submit In-Water Pile Driving Information to CDFW
  • Submit Over-Water Geotechnical Exploration Description to CDFW
  • Submit Phase 2 Authorization Package to CDFW
  • Submit Pre-implementation Phase Authorization Package to CDFW
  • Submit Preconstruction Survey Results for CDFW Approval
  • Submit Spill Prevention, Control, and Countermeasure Plan to CDFW
  • Submit Stormwater Pollution Prevention Plan to CDFW
Avoidance & BMPs26
  • Adjust and Retest Fish Screen Baffles After a Non-Compliant Test
  • Block burrows after confirming vacancy
  • Clean and decontaminate equipment at each work site
  • Complete fish salvage and relocation before in-water work
  • Conduct daily clearance surveys before work begins
  • Conduct hydroacoustic monitoring during in-water pile driving
  • Cover open excavations at the close of each working day
  • Delineate and sign occupied nest and roost buffers
  • Delineate Covered Species Habitat and Fence Construction Sites
  • Delineate habitat, buffers, and construction site boundaries
  • Dewater aquatic habitat and hold the dry period
  • Excavate and collapse burrows ahead of trenching
  • Flag and Sign Cross-Country Access Routes
  • Install Bird Strike Diverters on New Transmission Lines
  • Install Erosion and Sediment Control Measures Before Earth-Moving
  • Install erosion and sediment controls ahead of storms
  • Install ESA fencing and identification signage
  • Install exclusion barriers at work areas and shaft openings
  • Install visual barriers along night access routes
  • Install wildlife under-crossing culverts and speed limit signage
  • Obtain agency approval of designated wildlife handlers
  • Plant Vegetative Ground Cover on Disturbed Areas
  • Prepare the hazardous materials management plan
  • Remove and Clean North Delta Intake Fish Screens
  • Remove exclusion barriers after covered activities end
  • Remove Temporary Fill and Construction Refuse at Completion
Design1
  • Develop Refugia Design and Field Study Plan
Financial10
  • Calculate Phase Security Amount Before Phase Approval
  • Contribute Funding to the Longfin Smelt Culture Program
  • Establish Long-Term HM Lands Management Endowment
  • Fund Annual Endowment Deposit Amount Installment
  • Fund CHNWR, CHNSR and White Sturgeon Operations Mitigation
  • Pay Care and Treatment Costs for Injured Covered Species
  • Provide Annual Long-Term HM Lands Management Funding
  • Reimburse CDFW Costs for ITP Issuance and Monitoring
  • Submit and Update the CESA Mitigation Funding Strategy
  • Submit Covered Fish Monitoring Funding Strategy to CDFW
Monitoring18
  • Conduct and Report Preconstruction SWHA Nest Monitoring
  • Conduct Annual Invasive Plant Survey
  • Conduct Annual TRBL Survey During Construction
  • Conduct Baseline and Annual In-Water Mercury Monitoring
  • Conduct Ecological Response Evaluation Studies
  • Conduct Fisheries Evaluation Studies for Covered Fish
  • Conduct North Delta Intake Fish Screen Hydraulic Tests
  • Conduct Photo Monitoring of Temporary Impact Areas
  • Conduct Water Quality Evaluation Studies
  • Implement CDFW-Approved Subsurface Vibration Study
  • Implement Covered Fish Species Monitoring and Science Program
  • Implement Fish Screen Impingement Study
  • Inspect Sediment Deposition at Intake Tee Screens Annually
  • Install Real-Time Water Quality Monitoring Station
  • Notify Designated Representative of SWHA Nest Distress
  • Retest Fish Screen Hydraulics After a Qualifying Event
  • Survey Riverbank and Vegetation Conditions at Barge Sites
  • Verify Impact Multipliers in the Annual Status Report
Other1
  • Incorporate Litter and Erosion Control Language in Contractor Contracts
Plan45
  • Develop Covered Fish Species Abundance and Distribution Study Plan
  • Develop Environmental Compliance Monitoring Plan per Site
  • Develop Fish Guidance System Study Plan
  • Develop Hazardous Materials Management Plan
  • Develop Hydraulic Data Plan for Operating Criteria
  • Develop Migration and Survival Study Plan
  • Develop Predation Study Plan
  • Develop Real-Time Information Sharing Process with CDFW
  • Develop Sediment and Turbidity Monitoring Study Plan
  • Develop Sediment Reintroduction Plan
  • Develop Spill Prevention, Control, and Countermeasure Plan
  • Develop Spoils and Dredged Material Disposal Plan
  • Develop Temporary Impact Restoration Schedule
  • Prepare HM Lands Management Plan
  • Prepare Stormwater Pollution Prevention Plan
  • Submit Barge Operations Plan
  • Submit Bird Strike Diverter Location and Type Plan
  • Submit CBB Buffer Zone Design Plan
  • Submit CBB Nest Relocation Plan
  • Submit Covered Fish Species Monitoring and Science Plan
  • Submit CTS Relocation Plan
  • Submit Dewatering Plan
  • Submit Erosion and Sediment Control Plan
  • Submit Fertilizer Application Plan
  • Submit Fish Salvage Plan
  • Submit Fugitive Dust Control and Monitoring Plan
  • Submit GGS Relocation Plan
  • Submit Groundwater Testing and Monitoring Plan
  • Submit Herbicide and Pesticide Application Plan
  • Submit Hydraulic Testing Plan for Intake Fish Screens
  • Submit Invasive Plant Species Monitoring, Management and Control Plan
  • Submit Joint Operations Optimization Study Plan
  • Submit MALI Translocation Plan
  • Submit Mercury Management and Monitoring Plan
  • Submit North Delta Diversion Monitoring Team Charter
  • Submit Pile Driving Plan
  • Submit Preconstruction CTS Burrow Watering Protocol
  • Submit Restoration and Revegetation Plan
  • Submit Screen Impingement Study Plan
  • Submit Species and Habitat Survey Protocols to CDFW
  • Submit Subsurface Testing and Monitoring Study Plan
  • Submit SWHA Relocation Plan
  • Submit TRBL Relocation Plan
  • Submit Underground Well Detection Plan
  • Submit Underwater Sound Abatement Plan
Reporting61
  • Deliver Annual Status Report to CDFW
  • Deliver Final Phase Mitigation Report to CDFW
  • Deliver Mitigation Status Report Before ITP Expiration
  • Demonstrate Project Funding Arrangements to CDFW
  • Disclose Detected Wells in the Construction Phase Package
  • Notify CDFW 14 Days Before Starting Covered Activities
  • Notify CDFW 60 Days Before In-Water Maintenance
  • Notify CDFW and Provide a Plan for a Stay-Ahead Shortfall
  • Notify CDFW Before Dewatering or Fish-Isolating Work
  • Notify CDFW of a CBB Detection
  • Notify CDFW of a Land Manager Change
  • Notify CDFW of an Accidental Spill
  • Notify CDFW of Inability to Comply with the ITP
  • Notify CDFW of Likely Impact Exceedance and Revised Schedule
  • Notify CDFW of Nest Survey Results Before Vegetation Removal
  • Notify CDFW of Non-Operational Fish Screens
  • Notify CDFW of Potential CBB Nest Loss
  • Notify CDFW of SWHA Nest Abandonment or Distress
  • Notify CDFW of the Designated Representative and Substitutes
  • Notify CDFW of TRBL Colony or Roost Disturbance
  • Notify CDFW of TRBL Nest or Colony Abandonment or Distress
  • Notify CDFW When Fish Salvage Is Complete
  • Notify the Designated Biologist of CBB, CTS or SWHA Take or Injury
  • Notify the Designated Biologist of Covered Species Take or Injury
  • Provide NDDMT Raw Data and Modeling to CDFW on Request
  • Provide Title and Environmental Documentation for HM Lands
  • Report Barred Tiger Salamander or Hybrid Detections to CDFW
  • Report Bathymetric Survey Results to CDFW
  • Report CBB Sightings to the Designated Biologist
  • Report CBB, CTS and SWHA Take or Injury Incidents to CDFW
  • Report Construction-Phase CBB and MALI Survey Results
  • Report Covered Species Sightings to CDFW
  • Report Covered Species Take or Injury to CDFW
  • Report CTS and MALI Relocations to CDFW
  • Report GGS Relocations to CDFW
  • Report GPS-Recorded CBB Nest and MALI Locations to CDFW
  • Report Hydroacoustic and Pile Driving Monitoring Results
  • Report Hydroacoustic Threshold Exceedances to CDFW
  • Report Intake Sediment Deposition Assessment to CDFW
  • Report Invasive Aquatic Species Detections to CDFW
  • Report ITP Non-Compliance to CDFW
  • Report MALI and CTS Finds to the Designated Biologist
  • Report Mercury Monitoring Results to CDFW
  • Report Vessel Fuel Spills to CDFW OSPR
  • Report Vessel Groundings and Barge Plan Deviations to CDFW
  • Share Phase 1 Operations Data with CDFW
  • Submit Aquatic Conditions Assessments with the Phase 2 Package
  • Submit Covered Species Observations to CNDDB
  • Submit Credit Bill of Sale and Payment Receipt to CDFW
  • Submit Final Hydraulic and Sediment Models and Reports to CDFW
  • Submit Fish Screen Hydraulic Testing Data and Report to CDFW
  • Submit Joint Operations Study Results and Compliance Report
  • Submit Monthly Compliance Report to CDFW
  • Submit Phase 2 Project Operations Report to CDFW
  • Submit Photo Monitoring Documentation Report
  • Submit Preconstruction Habitat Survey Results in the Phase Package
  • Submit Preconstruction TRBL Survey Results to CDFW
  • Submit Restoration Monitoring Reports to CDFW
  • Submit Subsurface Vibration Study Results to CDFW
  • Submit Supplemental Phase 1 Operations Data Before Phase 2
  • Upload Stormwater Forms and Records to SMARTS
Restoration & Mitigation10
  • Backfill and Restore Preconstruction Investigation Sites
  • Complete HM Lands Start-Up Fencing, Signage and Enhancement
  • Complete Mitigation and HM Lands Protection Before Impacts
  • Develop and Implement Methylmercury Management Approach
  • Fund and Complete White Sturgeon Mitigation Projects
  • Plant Replacement Swainson's Hawk Nest Trees
  • Restore Riverbank Eroded by Barge Operations
  • Restore Temporarily Impacted Habitat to Pre-Project Conditions
  • Site, Design and Restore Construction Mitigation Habitat for Covered Fish
  • Site, Design and Restore Operations Mitigation Habitat for Covered Fish
Survey27
  • Complete Baseline Biological Assessment and Land Survey
  • Complete Pre-Disturbance Habitat Photo Documentation
  • Conduct and Report Annual CTS Surveys
  • Conduct and Report Annual GGS Surveys
  • Conduct and Report Annual SWHA Nest Tree Surveys
  • Conduct Annual CBB Flight Season Surveys
  • Conduct Annual MALI Surveys in Suitable Habitat
  • Conduct Baseline Food Web Resource Surveys
  • Conduct Baseline Invasive Plant Survey
  • Conduct Baseline TRBL Habitat Assessment
  • Conduct CTS Walking Clearance Survey Before Ground Disturbance
  • Conduct GGS Survey Before Exclusion Fencing Installation
  • Conduct Habitat Evaluation Field Survey
  • Conduct Nesting-Season SWHA Survey Before Field Investigations
  • Conduct Post-Dewatering GGS Clearance Survey
  • Conduct Pre-Activity CBB Foraging and Nest Surveys
  • Conduct Preconstruction CBB Habitat Survey
  • Conduct Preconstruction GGS Survey
  • Conduct Preconstruction MALI Survey
  • Conduct Preconstruction SWHA Nest Tree Survey
  • Conduct Preconstruction TRBL Breeding-Colony Surveys
  • Conduct Preconstruction TRBL Habitat Survey
  • Conduct Preconstruction TRBL Roosting-Habitat Surveys
  • Conduct Sacramento River Bathymetric Surveys Near the Intakes
  • Establish Restoration Treatment and Reference Transects
  • Flag Burrows and Habitat Features Before Earthmoving
  • Fund and Implement the DS/LFS Spawning Habitat Study
Training & Education4
  • Conduct Spill Response and Containment Training
  • Conduct Worker Education Program and Annual Refresher Training
  • Train and Staff Fish Salvage Teams Before Site Access
  • Train Tugboat and Barge Operators on Habitat Impacts
Selected: 0
Action text
Frequency
Deliverable
Species
Timing
Expected evidence
Requirements (0)
    Open action
    COA
    Requirement text
    Type
    Scope
    Frequency
    Responsible party
    Phases
    Timing
    Deliverable
    Species
    Construction activities
    Open requirement
    Help & Guidance

    Beacon

    On this page

    Terms

    Page