Agency reporting and approvals43
Agency approvals22
  • Calculate Phase Security Amount Before Phase Approval
  • Consult CDFW on Federal Biological Opinions
  • Coordinate with CDFW on Breeding Habitat Buffer Encroachment
  • Notify and Consult CDFW on ITP Amendment Conditions
  • Obtain CDFW Approval for In-Channel Work in the GGS Active Season
  • Obtain CDFW Approval of Dewatering Measure Deviations
  • Obtain CDFW Approval of HM Lands Before Acquisition
  • Obtain CDFW Approval of Nighttime Covered Activities
  • Obtain CDFW Approval of the Mitigation or Conservation Bank
  • Obtain CDFW Approval to Extend Phase 1 Operations
  • Obtain CDFW Approval to Work Outside the Seasonal Window
  • Obtain CESA Authorization for HM Lands Activities
  • Submit Aquatic Conditions Assessments with the Phase 2 Package
  • Submit Construction Phase Authorization Package to CDFW
  • Submit Fish Study Plans and Reports for CDFW Approval
  • Submit Joint Operations Study Results and Compliance Report
  • Submit Phase 2 Authorization Package to CDFW
  • Submit Pre-implementation Phase Authorization Package to CDFW
  • Submit Preconstruction Habitat Survey Results in the Phase Package
  • Submit Species and Habitat Survey Protocols to CDFW
  • Submit Subsurface Vibration Study Results to CDFW
  • Submit Supplemental Phase 1 Operations Data Before Phase 2
Non-compliance reporting2
  • Notify CDFW of Inability to Comply with the ITP
  • Report ITP Non-Compliance to CDFW
Periodic compliance reports3
  • Deliver Final Phase Mitigation Report to CDFW
  • Deliver Mitigation Status Report Before ITP Expiration
  • Submit Photo Monitoring Documentation Report
Schedule notices3
  • Conduct Preconstruction GGS Survey
  • Notify CDFW 14 Days Before Starting Covered Activities
  • Notify CDFW 60 Days Before In-Water Maintenance
Species sightings and CNDDB reporting3
  • Report Covered Species Sightings to CDFW
  • Submit Covered Species Observations to CNDDB
  • Biological Monitor daily communication and immediate reports to the Designated Biologist
Take and injury reporting10
  • Consult CDFW on Deceased CTS Specimen Disposal
  • Notify CDFW of Potential CBB Nest Loss
  • Notify CDFW of TRBL Nest or Colony Abandonment or Distress
  • Notify the Designated Biologist of CBB, CTS or SWHA Take or Injury
  • Notify the Designated Biologist of Covered Species Take or Injury
  • Report CBB, CTS and SWHA Take or Injury Incidents to CDFW
  • Report Covered Species Take or Injury to CDFW
  • Report GGS Relocations to CDFW
  • Submit Phase 2 Project Operations Report to CDFW
  • Carcass salvage, labeling and storage for the wildlife health lab
Air quality14
Fugitive dust14
  • Plant Vegetative Ground Cover on Disturbed Areas
  • Submit Fugitive Dust Control and Monitoring Plan
  • Access Route Surface Stabilization
  • Dryer and Conveyor Enclosure
  • Dust Complaint Sign
  • Fugitive Dust Suppression
  • Haul Truck Cover and Freeboard
  • Inactive Area Stabilization
  • Prompt Paving After Grading
  • Stabilized Construction Entrances
  • Stockpile Tackifier Application
  • Tire Wash Stations
  • Track-Out Removal
  • Wind Breaks
Amphibians and reptiles53
Amphibians31
  • Conduct and Report Annual CTS Surveys
  • Conduct CTS Walking Clearance Survey Before Ground Disturbance
  • Conduct daily clearance surveys before work begins
  • Consult CDFW on Non-Native or Hybrid Salamander Measures
  • Report Barred Tiger Salamander or Hybrid Detections to CDFW
  • Submit CTS Relocation Plan
  • Submit Preconstruction CTS Burrow Watering Protocol
  • Biological monitoring of initial grading and excavation
  • Biologist presence during site selection, access and set-up
  • Biologist survey before work resumes after rain
  • Breeding habitat no-activity buffer
  • Burrow avoidance
  • Burrow Avoidance
  • Burrow monitoring when night lighting spills toward habitat
  • Burrow release protocol
  • Clearance survey after barrier repair
  • Daily burrow check before work starts
  • Habitat disturbance work window
  • Habitat Disturbance Work Window
  • Hand excavation of burrows in the trench alignment
  • Morning survey after burrow watering
  • Mowing pattern
  • Mowing Pattern
  • Night Work Prohibition After Construction
  • No-Activity Buffer Around Occupied Burrows
  • No-activity buffer around occupied burrows and refugia
  • Occupied burrow no-activity buffer
  • Presence surveys before and during each work day
  • Presence surveys before and during each work day
  • Site survey before work on days with rain forecast
  • Yearly site assessment of the active season
Giant garter snake22
  • Block burrows after confirming vacancy
  • Conduct and Report Annual GGS Surveys
  • Conduct GGS Survey Before Exclusion Fencing Installation
  • Conduct Post-Dewatering GGS Clearance Survey
  • Dewater aquatic habitat and hold the dry period
  • Install ESA fencing and identification signage
  • Submit GGS Relocation Plan
  • Submit Habitat Disturbance Footprint and ESAs for CDFW Approval
  • Avoidance of Federally Listed Species
  • Canal bank disturbance avoidance
  • Canal Bank Disturbance Avoidance
  • Canal excavation limited to one side
  • Canal Spoils Placement
  • Daily inspection of environmentally sensitive area markings
  • ESA demarcation observed
  • Flagging of suitable upland habitat at work sites
  • In-Channel Work Window
  • Investigation of burrows for occupancy
  • Maintenance Ground Disturbance Limit
  • Resurvey after a lapse in covered activities
  • Staging Area Setback from Habitat
  • Suitable habitat delineation maintained
Birds54
Bird strike diverters1
  • Submit Bird Strike Diverter Location and Type Plan
Nesting birds53
  • Conduct and Report Annual SWHA Nest Tree Surveys
  • Conduct and Report Preconstruction SWHA Nest Monitoring
  • Conduct Annual TRBL Survey During Construction
  • Conduct Baseline TRBL Habitat Assessment
  • Conduct Nesting-Season SWHA Survey Before Field Investigations
  • Conduct Preconstruction SWHA Nest Tree Survey
  • Conduct Preconstruction TRBL Breeding-Colony Surveys
  • Conduct Preconstruction TRBL Habitat Survey
  • Conduct Preconstruction TRBL Roosting-Habitat Surveys
  • Delineate and sign occupied nest and roost buffers
  • Map and Submit Nesting, Foraging and Roosting Sites to CDFW
  • Notify CDFW of Nest Survey Results Before Vegetation Removal
  • Notify CDFW of SWHA Nest Abandonment or Distress
  • Notify CDFW of TRBL Colony or Roost Disturbance
  • Notify Designated Representative of SWHA Nest Distress
  • Obtain CDFW Approval of a Reduced SWHA Nest Buffer
  • Obtain CDFW Approval to Remove or Trim a Known Nest Tree
  • Obtain CDFW Approval to Work During the SWHA Nesting Season
  • Plant Replacement Swainson's Hawk Nest Trees
  • Submit Buffer Zone Designs and Locations for CDFW Approval
  • Submit Preconstruction TRBL Survey Results to CDFW
  • Submit SWHA Relocation Plan
  • Submit TRBL Relocation Plan
  • Active colony buffer
  • Biologist stop-work authority for distressed nesting birds
  • Break areas out of nest line of sight
  • Break areas outside buffers
  • Daily monitoring of an active colony near work
  • Daily monitoring of an occupied roost site near work
  • Daylight work limit near nests
  • Disruptive Activity Timing
  • Distance-tiered nest observation during covered activities
  • Equipment staging out of nest line of sight
  • Helicopter buffer from colonies
  • Helicopter Daylight Limit
  • Helicopter setback from nests
  • Irrigation and maintenance of replacement nest trees
  • Mixed flock roost occupancy presumption
  • Monitoring of replacement nest trees
  • Nest tree removal avoidance
  • Nest Tree Removal Avoidance
  • Nesting season work restriction
  • No contact with occupied nest trees
  • No exiting vehicles within buffers
  • No physical contact with colonies
  • No removal of occupied nest trees
  • Occupancy checks of unoccupied roost sites during work
  • Occupied nest no-activity buffer
  • Occupied roost buffer
  • Replacement nest tree survival standard and replanting
  • Response to colonization adjacent to work
  • Siting of replacement nest sites
  • Stop work on signs of distress
Fish3
Aquatic habitat mitigation3
  • Coordinate with CDFW on Mitigation Site Selection and Design
  • Site, Design and Restore Construction Mitigation Habitat for Covered Fish
  • Site, Design and Restore Operations Mitigation Habitat for Covered Fish
Habitat protection74
Exclusion fencing and ESAs17
  • Delineate Covered Species Habitat and Fence Construction Sites
  • Delineate habitat, buffers, and construction site boundaries
  • Flag and Sign Cross-Country Access Routes
  • Flag Burrows and Habitat Features Before Earthmoving
  • Install exclusion barriers at work areas and shaft openings
  • Remove exclusion barriers after covered activities end
  • Submit Exclusion Barrier Design and Locations to CDFW
  • Biological monitoring during exclusion barrier installation
  • Exclusion barrier construction specification
  • Exclusion fencing gate closure
  • Exclusion fencing in place during covered activities
  • Exclusion Fencing Inspection and Repair
  • Exclusion fencing repair
  • Habitat and buffer markers maintained
  • Inspection and reporting of habitat fencing, stakes and flags
  • Refuge cover along exclusion fencing
  • Vegetation maintenance along exclusion fencing
Habitat avoidance and work footprint9
  • Conduct Habitat Evaluation Field Survey
  • Avoidance Measures in Unmapped Habitat
  • Conservation Easement Buffer
  • Geotechnical investigation avoidance of aquatic features
  • No Disturbance of CDFW Conserved Lands
  • Suitable habitat avoidance
  • Suitable Habitat Avoidance
  • Work footprint limit
  • Work Footprint Limit
Habitat impact tracking10
  • Calculate Phase Impacts and Mitigation for Authorization Package
  • Complete Pre-Disturbance Habitat Photo Documentation
  • Conduct Photo Monitoring of Temporary Impact Areas
  • Establish Restoration Treatment and Reference Transects
  • Notify CDFW of Likely Impact Exceedance and Revised Schedule
  • Report Habitat Disturbance Acreage and GIS Layers to CDFW
  • Survey Riverbank and Vegetation Conditions at Barge Sites
  • Verify Impact Multipliers in the Annual Status Report
  • GIS tracking of land disturbance and suitable habitat feature impacts
  • GIS tracking of land disturbance and suitable habitat feature impacts
Vegetation removal15
  • Obtain CDFW Approval of Mowing or Clearing Equipment
  • Biologist presence during vegetation management
  • Channel bank mowing limits
  • Emergent vegetation left unmowed
  • Emergent Vegetation Mowing Avoidance
  • Hand Tool Trimming of Protected Vegetation
  • Mower blade height
  • Mower Blade Height
  • Mowing Timing Limit
  • Mowing timing limits
  • Upland Discing Prohibition
  • Vegetation Removal Minimization
  • Vegetation removal minimized
  • Vegetative Material Disposal
  • Woody Vegetation Removal Window
Wildlife encounters and handling16
  • Excavate and collapse burrows ahead of trenching
  • Pay Care and Treatment Costs for Injured Covered Species
  • Care and authorized release of covered species taken into captivity
  • Care of covered species injured by covered activities
  • Care of injured covered species
  • Care of Injured Covered Species
  • Covered species capture and handling
  • Covered Species Capture and Handling
  • Covered Species Encounter Reporting to the Biologist
  • Covered species relocation
  • Covered Species Relocation
  • Injured Wildlife Rehabilitation Transport
  • Monitoring record of covered species capture and relocation
  • Wildlife encounter response
  • Wildlife Encounter Response
  • Work Stoppage on Covered Species Encounter
Wildlife entrapment7
  • Cover open excavations at the close of each working day
  • Biologist inspection and presence when excavations are filled or covered
  • Debris Pile Removal
  • Inspection of stored pipes, culverts and similar structures for wildlife
  • Morning inspection of overnight equipment, materials and excavations for trapped wildlife
  • Wildlife check of idle vehicles and equipment before moving
  • Wildlife in stored materials response
Hazards40
Fire prevention3
  • Fire Suppression Supplies On Site
  • Vegetation clearing method for fire prevention
  • Vegetation Clearing Method for Fire Prevention
Hazardous materials13
  • Develop Hazardous Materials Management Plan
  • Develop Spoils and Dredged Material Disposal Plan
  • Obtain CDFW Permission for Hazardous Material Use Near Streams
  • Prepare the hazardous materials management plan
  • Submit Hazardous Materials Management Plan to CDFW
  • Concrete Washwater Containment
  • Contaminated Soil Segregation and Removal
  • Database of historic contamination and hazardous materials inspections
  • Hazardous Materials Container Labeling
  • Hazardous Materials in Designated Storage
  • Hazardous Materials Storage Duration Limit
  • Material Safety Data Sheets provided to site personnel
  • Petroleum Storage Containment
Pesticides and rodenticides8
  • Obtain CDFW Approval for Pesticide and Herbicide Use
  • Submit Fertilizer Application Plan
  • Submit Fertilizer Application Plan for CDFW Approval
  • Submit Herbicide and Pesticide Application Plan
  • Licensed Pesticide Applicator
  • Pesticide Application Wind Limit
  • Pesticide Setback from Aquatic Habitat
  • Rodenticide and Poison Prohibition
Refueling and equipment servicing5
  • Daily contaminant leak check and maintenance of vehicles and equipment
  • Daily inspection of equipment in contact with water for petroleum leaks
  • Fuel Transfer Containment
  • Refueling Practices
  • Refueling Setback from Water
Spill prevention and response11
  • Conduct Spill Response and Containment Training
  • Develop Spill Prevention, Control, and Countermeasure Plan
  • Notify CDFW of an Accidental Spill
  • Report Vessel Fuel Spills to CDFW OSPR
  • Submit Spill Prevention, Control, and Countermeasure Plan to CDFW
  • Equipment Cleaning Before Water Contact
  • Oil Absorbent Booms in Place
  • Spill Containment and Response
  • Spill Kits On Site
  • Spill Response
  • Staging Area Spill Containment
Lighting5
Lighting near habitat and waters5
  • Install visual barriers along night access routes
  • Access road location assessment before visual barrier installation
  • Intake Lighting Restricted from the River Channel
  • Lighting Color Near Habitat
  • Night Lighting Spill Control
Mitigation and restoration52
Conservation endowment4
  • Obtain CDFW Approval of the Endowment Management Agreement
  • Prepare Endowment Assessment for CDFW Approval
  • Submit Endowment Assessment for CDFW Approval
  • Submit Endowment Manager Proposal to CDFW
Mitigation funding2
  • Funding of interim management of Habitat Management lands
  • Holding, pooling and disbursement of the Endowment
Mitigation funding contributions1
  • Fund CHNWR, CHNSR and White Sturgeon Operations Mitigation
Mitigation lands26
  • Complete Baseline Biological Assessment and Land Survey
  • Complete HM Lands Start-Up Fencing, Signage and Enhancement
  • Complete Mitigation and HM Lands Protection Before Impacts
  • Demonstrate Project Funding Arrangements to CDFW
  • Designate CDFW-Approved Interim and Long-Term Land Managers
  • Establish Long-Term HM Lands Management Endowment
  • Fund Annual Endowment Deposit Amount Installment
  • Notify CDFW and Provide a Plan for a Stay-Ahead Shortfall
  • Notify CDFW of a Land Manager Change
  • Obtain CDFW Approval of Mitigation Habitat Restoration Projects
  • Obtain CDFW Approval of the HM Lands Conservation Easement
  • Prepare HM Lands Management Plan
  • Prepare Phase Security Cost Estimate for HM Lands
  • Provide Annual Long-Term HM Lands Management Funding
  • Provide Title and Environmental Documentation for HM Lands
  • Reimburse CDFW Costs for ITP Issuance and Monitoring
  • Submit and Update the CESA Mitigation Funding Strategy
  • Submit Credit Bill of Sale and Payment Receipt to CDFW
  • Compensatory habitat acreage for each covered species
  • Fee title to Habitat Management lands
  • Habitat Management lands stay-ahead ratio
  • Integration of the spawning habitat study into shallow spawning habitat design
  • Interim management of Habitat Management lands
  • Long-term monitoring of tidal habitat mitigation sites
  • Ongoing demonstration of mitigation performance during the permit term
  • Perpetual management, maintenance and monitoring of Habitat Management lands
Restoration18
  • Backfill and Restore Preconstruction Investigation Sites
  • Develop Temporary Impact Restoration Schedule
  • Develop Tidal Wetland Restoration Efficacy Study Plan
  • Remove Temporary Fill and Construction Refuse at Completion
  • Restore Riverbank Eroded by Barge Operations
  • Restore Temporarily Impacted Habitat to Pre-Project Conditions
  • Submit Restoration and Revegetation Plan
  • Submit Restoration Monitoring Reports to CDFW
  • Erosion protection of restoration soils until vegetation establishes
  • Invasive plant management and cover limit at restoration sites
  • Monitoring and maintenance of habitat restoration areas
  • Monitoring of restored habitat until success
  • Restoration survivorship and cover success standards with remedial action
  • Seed mix composition and sourcing for restoration
  • Seeding timing and reseeding at restoration sites
  • Substrate removal, topsoil salvage and imported fill in restoration areas
  • Target native vegetation community for each restoration area
  • Vehicle Barriers on Restored Shoulders
Security and funding assurances1
  • Submit Covered Fish Monitoring Funding Strategy to CDFW
Noise and vibration20
Pile driving and underwater sound18
  • Conduct hydroacoustic monitoring during in-water pile driving
  • Report Hydroacoustic and Pile Driving Monitoring Results
  • Report Hydroacoustic Threshold Exceedances to CDFW
  • Submit In-Water Pile Driving Information to CDFW
  • Submit Pile Driving Plan
  • Submit Underwater Sound Abatement Plan
  • Continual hydroacoustic monitoring of in-water work
  • Escape route during multiple pile driver operation
  • Hours of the day for pile driving
  • Impact pile driving limits
  • Pile Driving Hour Limit
  • Pile driving noise attenuation
  • Pile driving soft start
  • Shoulder-season pile driving restrictions
  • Underwater noise disturbance threshold outside the construction work window
  • Underwater noise threshold outside the work window
  • Underwater noise threshold within the work window
  • Watch for distressed or injured fish during pile driving
Vibration2
  • Implement CDFW-Approved Subsurface Vibration Study
  • Submit Subsurface Testing and Monitoring Study Plan
People and qualifications14
Designated biologists and monitors10
  • Conduct Baseline Invasive Plant Survey
  • Obtain CDFW Approval of a Substitute Biologist or Monitor
  • Submit Annual Biologist Reapproval List to CDFW
  • Submit Biologist Resume Forms to CDFW Before Each Phase
  • Approved Wildlife Handler
  • Biological Monitor qualifications and permitted scope
  • Biologist or monitor on site during take-risk construction activities
  • Designated Biologist and Fisheries Biologist qualifications and responsibilities
  • Handling and relocation restricted to the approved Designated Biologist
  • Stop-work authority of biologists and monitors
Qualified specialists2
  • Notify CDFW of the Designated Representative and Substitutes
  • Permitted personnel for studies that may take Covered Fish Species
Worker training2
  • Conduct Worker Education Program and Annual Refresher Training
  • Train Tugboat and Barge Operators on Habitat Impacts
Plants and invertebrates28
Bumble bees and monarchs19
  • Conduct Annual CBB Flight Season Surveys
  • Conduct Pre-Activity CBB Foraging and Nest Surveys
  • Conduct Preconstruction CBB Habitat Survey
  • Notify CDFW of a CBB Detection
  • Obtain agency approval of designated wildlife handlers
  • Report CBB Sightings to the Designated Biologist
  • Submit CBB Buffer Zone Design Plan
  • Submit CBB Nest Relocation Plan
  • Active nest buffer
  • Daily visual sweeps for bee flight activity during work
  • Flowering Vegetation Removal Timing
  • Inspection and supervision of refugia removal during overwintering
  • Monitoring of a relocated nest
  • Overwintering Habitat Disturbance Avoidance
  • Relocation as a last resort under the approved protocol
  • Search for the active nest when a bee is detected on site
  • Stop work on covered species discovery
  • Underground refugia buffer
  • Vegetation removal clearance near refugia
Special-status plants9
  • Conduct Annual MALI Surveys in Suitable Habitat
  • Conduct Preconstruction MALI Survey
  • Report CTS and MALI Relocations to CDFW
  • Submit MALI Translocation Plan
  • Avoidance of covered plant removal
  • Covered Plant Removal Avoidance
  • Levee Landside Line Maintenance
  • Post-disturbance grading to elevations and hydrology suitable for covered plants
  • Special-status plant occurrence buffer
Site conduct35
Access routes and parking6
  • Obtain CDFW Approval to Construct Off-Site Travel Routes
  • Equipment Confined to Access Routes
  • Equipment confined to designated access routes
  • Equipment Storage Setback from Aquatic Habitat
  • Staging Area Confinement
  • Use of Established Access Routes
Agency and biologist access6
  • Agency access to construction sites
  • CDFW access to the Project and mitigation lands
  • Construction-monitoring documentation kept on site
  • No agreements restricting contractor or biologist communication with CDFW
  • Unfettered biologist access to the Project Site
  • Wallet card or fact sheet carried by workers in the Project Area
Compliance inspections and records4
  • Develop Environmental Compliance Monitoring Plan per Site
  • Submit Monthly Compliance Report to CDFW
  • Daily biologist compliance inspection at each construction site and maintenance activity
  • Daily written observation and inspection record
Facility design and siting6
  • Install Bird Strike Diverters on New Transmission Lines
  • Submit Culvert Under-Crossing Count and Location Report
  • Annual inspection and replacement of bird strike diverters
  • Bird Strike Diverter Maintenance
  • Power line and support structure siting away from covered species habitat
  • Roadway design passable by covered species
Pets, firearms and campfires1
  • No Pets, Campfires or Firearms On Site
Speed limits6
  • Nighttime Speed Limit
  • Paved Road Speed Limit
  • Speed Limit Near Habitat
  • Speed Limit Posting
  • Unpaved Road Speed Limit
  • Wildlife Crossing Signage
Trash and food waste4
  • Covered Food Waste Containers
  • Trash Abatement
  • Trash Load Covering
  • Trash Removal Cadence
Work hours2
  • Daytime Work Hour Limit
  • Night Vehicle Travel Caution
Water65
Barge and vessel operations9
  • Report Vessel Groundings and Barge Plan Deviations to CDFW
  • Submit Barge Operations Plan
  • Barge Mooring and Anchoring
  • Biological monitoring of barge operations
  • Propeller Wash Limit
  • Vessel Deck Loose Material Containment
  • Vessel Navigation Regulation Compliance
  • Vessel Speed and Wake Limit
  • Vessel Spill Kits Onboard
Dewatering6
  • Submit Dewatering Plan
  • Biologist present to salvage snakes during dewatering
  • Dewatering Pump Intake Screening
  • Dewatering pump shutdown
  • Dewatering rate limit
  • Dewatering Window
Erosion and sediment control24
  • Install Erosion and Sediment Control Measures Before Earth-Moving
  • Install erosion and sediment controls ahead of storms
  • Obtain CDFW Approval of Erosion Control Stabilization Measures
  • Submit Erosion and Sediment Control Plan
  • Damaged Pavement Repaving
  • Emergency Erosion Control Supplies On Site
  • Erosion Control in Place Before Storms
  • Erosion control inspection before, during and after storms
  • Erosion Control Material Standard
  • Ground Disturbance Minimization
  • Grubbed Material Disposal
  • Inspection of erosion controls before, during and after rain events
  • Monitoring of the 72-hour weather forecast for each project site
  • Monofilament Netting Prohibition
  • Precipitation Work Limit
  • Runoff and Drainage Control
  • Sediment Control Measures
  • Sizing, siting and protection of spoils and RTM storage sites
  • Spoils Storage Site Siting
  • Stockpile Placement and Covering
  • Storm Onset Work Restriction
  • Vegetation Retention for Erosion Control
  • Wind Erosion Control
  • Work limits during precipitation
Geotechnical exploration1
  • Submit Over-Water Geotechnical Exploration Description to CDFW
Groundwater3
  • Disclose Detected Wells in the Construction Phase Package
  • Submit Groundwater Testing and Monitoring Plan
  • Submit Underground Well Detection Plan
In-water work3
  • Daily In-Water Work Limit
  • In-Water Work Window During Construction
  • In-Water Work Window During Pre-Construction
Invasive species10
  • Clean and decontaminate equipment at each work site
  • Conduct Annual Invasive Plant Survey
  • Report Invasive Aquatic Species Detections to CDFW
  • Submit Invasive Plant Species Monitoring, Management and Control Plan
  • Invasive Animal Removal
  • Invasive plant removal methods in restoration areas
  • Invasive species inspection of in-water equipment before deployment
  • Invasive Species Spread Prevention
  • Pathogen Spread Prevention BMPs
  • Predatory Species Introduction Prohibition
Stormwater and discharges5
  • Prepare Stormwater Pollution Prevention Plan
  • Submit Stormwater Pollution Prevention Plan to CDFW
  • Upload Stormwater Forms and Records to SMARTS
  • Non-Stormwater Discharge Prevention
  • Reusable Tunnel Material Drainage Discharge
Water quality4
  • Conduct Baseline and Annual In-Water Mercury Monitoring
  • Develop and Implement Methylmercury Management Approach
  • Report Mercury Monitoring Results to CDFW
  • Submit Mercury Management and Monitoring Plan
Unfiled7
Needs a home7
  • Deliver Annual Status Report to CDFW
  • Incorporate Litter and Erosion Control Language in Contractor Contracts
  • Install wildlife under-crossing culverts and speed limit signage
  • Report Construction-Phase CBB and MALI Survey Results
  • Report GPS-Recorded CBB Nest and MALI Locations to CDFW
  • Report MALI and CTS Finds to the Designated Biologist
  • Submit Preconstruction Survey Results for CDFW Approval
Selected: 0