4
ActionFrequencyCommitments
Training & Education
Conduct Spill Response and Containment TrainingCOA 11.22
Conduct Worker Education Program and Annual Refresher TrainingRecurringCOA 9.4, COA 11.82
Train and Staff Fish Salvage Teams Before Site AccessOne timeCOA 11.35
Train Tugboat and Barge Operators on Habitat ImpactsCOA 11.36

Training & Education

Conduct Spill Response and Containment Training

COA 11.22

Permittee trains Project personnel who handle petroleum products and other hazardous materials in emergency response and spill containment techniques as required by the Spill Prevention, Control, and Countermeasure Plan. Training is delivered before those personnel perform the covered work and completion is captured on a signed roster filed with the SPCCP.

Byron Tract Forebay
Not StartedDue 2026-11-29
Intake B — North Delta
In ProgressDue 2026-09-24

Conduct Worker Education Program and Annual Refresher Training

COA 9.4, COA 11.82

A Designated Biologist, Fisheries Biologist, or Biological Monitor presents the Condition of Approval 9.4 education program to every person working in the Project Area before that person performs any work, covering Covered Species biology and timing windows, the Conditions of Approval, take-minimization protocols, non-covered listed species, site boundaries and disturbance-free zones, habitat avoidance, fencing and staking, roles, encounter and emergency procedures, and legal status and…

Frequency
Recurring
Timing
before performing any work; repeated at least once annually for long-term and/or permanent employees
Byron Tract Forebay
In ProgressDue 2026-09-021 of 3 done
Intake B — North Delta
Not StartedDue 2026-12-022 of 3 done

Train and Staff Fish Salvage Teams Before Site Access

COA 11.35

Before fish rescue workers access the work site, Permittee provides safety training and assigns at least one Designated Fisheries Biologist to each fish salvage team. Electrofishing is staffed as one or two teams of three to four people, each with a unit operator and two or three netters. The product is a dated safety-training roster and a salvage team roster for the salvage event.

Frequency
One time
Timing
prior to accessing the work site
Intake C — North Delta
Completed
Bethany Reservoir Aqueduct
Completed
Southern Forebay & Pumping Plant
Not StartedDue 2026-09-01

Train Tugboat and Barge Operators on Habitat Impacts

COA 11.36

Permittee ensures every tugboat and barge operator working on the Project is trained to minimize impacts on Covered Species habitat, including reducing the effects of wake on vegetated banks, before that operator runs a Project vessel. Completion is documented for each named operator.

Intake B — North Delta
In ProgressDue 2026-09-14